My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION �r <br /> MARKTHOMAS <br /> Traffic analysis will be prepared to confirm paint surveys. These services, if needed, can be <br /> intersection lane configurations and turn pockets provided at an additional cost. <br /> are adequately sized to support future traffic with 6.3.3 Air Quality <br /> the project. Off-ramp queues will also be <br /> evaluated to confirm 1-5 mainline traffic would not The Project is located within Orange County region <br /> be affected by potential spillback. of the South Coast Air Basin (SCAB). The SCAB <br /> It is assumed that no more than two rounds of <br /> region where the project is located is within a comments will be received on the draft study from nonattainment area for the federal 8-hour ozone <br /> the City and Caltrans. (03), lead, and particulate matter less than 2.5 <br /> micrometers in diameter (PM2,0 standards and <br /> 6.3.2 Phase I ESA within an attainment/maintenance area for the <br /> A Project-wide Phase 1 Environmental Site federal carbon monoxide (CO) and particulate <br /> Assessment (ESA) will be prepared for the project matter less than 10 micrometers in diameter <br /> area. Additionally, we will review the Phase II work (PM14) standards. Therefore, the Project is subject <br /> prepared by others in the prior phase and provide to Transportation Conformity. A Supplemental Air <br /> input on what applies to the Project. Note that this Quality Report will be prepared to address the <br /> scope does not include parcel-specific ESAs for change in the Project design (reduction in number <br /> parcels to be acquired for the Project. of lanes, etc.), the updated traffic study that will be <br /> prepare, and the changes in air quality related <br /> The ESA will check for historical evidence of requirements. The Air Quality report will consist of <br /> potential site contamination for the Project study the following. <br /> area and will be performed in general accordance Regulatory Setting and Existing Conditions. <br /> with ASTM E1527-21 and Caltrans Standards, and Summarize the existing federal, state, and local air <br /> will consist of the following: quality regulatory environment as it affects the <br /> • Conducting a review of available existing proposed project, and describe the location of <br /> local, state, and federally maintained sensitive receptors in the project vicinity. Using <br /> databases of hazardous materials sites and data provided by the California Air Resources <br /> underground storage tank records Board (ARB) and the South Coast Air Quality <br /> generated by EDR, Inc. Management District (SCAQMD), the report will <br /> • Reviewing available historic aerial characterize existing air quality conditions in the <br /> photographs and topographic maps to help project area and explain how those conditions are <br /> identify prior land uses. affected by local climate and topography. <br /> • Performing a brief visual of the Project from Regional Conformity. Evaluate whether the project <br /> the public right-of-way to document existing meets regional transportation conformity <br /> conditions. requirements by determining whether it is included, <br /> • Identifying sites of recognized as currently defined, in the most recent Regional <br /> environmental conditions (REC) that may Transportation Plan/Sustainable Communities <br /> have significant potential impact on the Strategy (RTPISCS) and Federal Transportation <br /> Project construction and/or environment. Improvement Program (FTIP) prepared by the <br /> • Preparing a draft Phase I ESA report. Southern California Association of Governments <br /> • Responding to one set of review comments (SCAG). <br /> from the agency and providing a final <br /> report. Project-Level Conformity. Evaluate whether the <br /> project meets project-level transportation <br /> The scope of services specifically excludes a conformity requirements, which will also be used to <br /> Phase II investigation for hazardous materials, an support the CEQAINEPA analysis. <br /> evaluation for aerially deposited lead or other <br /> chemicals of concern, and asbestos or lead-based Localized Carbon Monoxide Hof Spot <br /> Analysis. Analyze the degree to which <br /> project-related traffic volumes have a <br />
The URL can be used to link to this page
Your browser does not support the video tag.