My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> MARK THOMAS <br /> future proposed conditions. There will need to be . Street Flow/Catch Basin analysis. Street <br /> confirmation if the Interstate 5 sump to the north flow hydraulics of the existing roadway and <br /> outputs it's pumped flow to a pipe that leads to the catch basins will be analyzed for the <br /> south to the project site to join the main drainage roadway hazard during design storm <br /> pipe. This includes a site visit to the project site to events. <br /> review the watershed and the Caltrans pump . Proposed Condition Alternative Measures. <br /> station. Conceptual designs will be developed to <br /> Based on topographic data, the improvement minimize storm flows to the proposed <br /> plans, and confirmation of the drainage patterns to project grade crossing and associated <br /> the site through coordination with Orange County pump station location. This will evaluate <br /> Flood Control District and Caltrans, Tetra Tech measures that may include diverting flows <br /> WTR will conduct a series of analyses based on around the project site, detaining water in <br /> the OCPW Hydrology Manual (OCHM) basins or offline catchments, and <br /> methodology generating high confidence flows stormwater infiltration. <br /> (per the OCHM Addendum) for flood control • A technical memorandum will be prepared, <br /> design purposes that will include the following: summarizing the baseline existing condition <br /> • A Hydrology Study. This will include an of the project drainage area and include <br /> study assumptions, results, and findings for <br /> existing condition baseline study of the each task previously fisted to inform the <br /> watershed, flow paths, concentration pump station proposed design and <br /> points, and routing delineations based on potential alternative measures that could be <br /> topography and pipe dimensions/elevations. It also includes land incorporated to limit the pump station <br /> sizing. <br /> use, and land cover per the Orange County <br /> hydrology manual and available Orange After review and incorporation of the results of the <br /> County geomatics data. baseline study by the project design team and <br /> • Rational Method Analysis. Using the pump station design team, a proposed condition <br /> hydrology input, the rational method will be analysis will be performed incorporating new <br /> implemented in AES to determine time of grading, drainage patterns, and pump station and <br /> concentration and designed discharges for pipe locations, etc. This will include: <br /> the 10, 25, and 100 year events which • Proposed condition Hydrology Study <br /> aligns with both the City of Santa Ana and • Proposed condition Rational Method <br /> Orange County Public Works (OCPW) Analysis <br /> requirements. • Proposed condition Unit Hydrograph <br /> • Unit Hydrograph Analysis. Using the Analysis <br /> hydrology input, a unit hydrograph method . Proposed condition WSPG analysis to <br /> will be implemented also to determine include HEC-HMS for modeling the pump <br /> volumes discharged to the proposed pump station functionality <br /> station. • Proposed condition Street Flow/Catch <br /> • WSPG Analysis. Pipe hydraulics will be Basis analysis, and <br /> conducted using the Los Angeles County • Proposed condition Technical <br /> 2018 WSGP software for all the proposed Memorandum <br /> pipe systems that lead to the proposed <br /> pump station and pump station outlet pipe 7.3.2 Pump Station (inclusive of structure, <br /> to the existing storm drain system. If the electrical, mechanical, SCADA) and <br /> Caltrans pump on Interstate 5 to the north Retention Basin <br /> discharges into the project area, an The design of the pump station and retention <br /> evaluation of that pump system and design includes the following: <br /> resulting outflows will be included based on <br /> provided data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.