My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA <br /> 4 SANTA ANA BOULEVARD GRADE SEPARATION ; <br /> MARKTHOMAS <br /> 7.2.5 Traffic Signal & Interconnect 7.2.7 Utility Plans <br /> It is assumed that the following is required: Utility plans will be provided within the project <br /> • One traffic signal modification at Santa Ana limits. Existing utilities (type, owner, disposition) <br /> Boulevard/Santiago Street (City) will be shown. Proposed utilities will be added to <br /> ' <br /> One new traffic signal at Santa Ana the plans as the utility coordination advances and Boulevard/Fuller Street (City) utility relocation plans are being developed. A <br /> Utility Pothole table will be included when <br /> • One traffic signal modification at Santa Ana available. The following sheets are anticipated: <br /> Boulevard/1-5 Southbound Ramps(Caltrans) Utility Plans (6) <br /> For traffic signal modifications the City will request 7.2.8 Water Main Relocations <br /> new service cabinets, controller cabinets, controller Tetratech will prepare construction drawings for <br /> hardware, and poles, as well as traffic signal the Water Main relocations for the 35%, 65%, <br /> interconnect and fiber. 95%, 100%, and Final submittals. It is assumed <br /> Record drawings will be collected for electrical that the following is required: <br /> systems from Caltrans and City of Santa Ana, • General notes /abbreviations /construction <br /> including Traffic Signals, Street Lighting, notes (1) <br /> Interconnect, and Caltrans Fiber Optic • Horizontal control plan (1) <br /> Communications. A field visit will be performed to • Key map for pipeline alignments (1) <br /> confirm (where possible) the data described in the • Plan and Profile sheets (5, 20 scale) <br /> record drawings and collect information that will be . Detail sheets with existing pipeline <br /> needed to perform the design. connection details, service line/meter detail, <br /> It is assumed there are no traffic monitoring (TMS) valve detail, hydrant detail, casing detail <br /> features and that updates to the ramp meters will and miscellaneous details (2) <br /> not be required. This scope does not assume • Total Sheets: 10 <br /> temporary traffic signals will be required. 7.2.9 Sewer Main Relocations <br /> Our sheet assumptions associated with the above Mark Thomas will prepare construction drawings <br /> design requirements are as follows: for the Sewer Main relocations for the 35%, 65%, <br /> • City Traffic Signal Plans (2) 95%, 100%, and Final submittals. It is assumed <br /> • Caltrans Signal Plans (1) that the following is required: <br /> • Traffic Signal Interconnect (1) • Plan and Profile sheets (3, 20 scale) <br /> • Total sheets: 4 • Detail sheets (2) <br /> 7.2.6 Street and Pedestrian Lighting <br /> • Total Sheets:4 <br /> Street lighting will be provided along Santa Ana 7.3 Drainage Improvements <br /> Boulevard and Fuller Street. Pedestrian level 7.3.1 Hydrology & Hydraulics Report <br /> lighting along the pedestrian path from Santiago Tetra Tech will prepare hydrologic and hydraulic <br /> Street to the pedestrian bridge, the stairs, the analyses, calculations, and reports to support <br /> pedestrian bridge, and the pedestrian promenade. required storm drain relocation and realignment. <br /> It is assumed that no Caltrans lighting is required. <br /> Fehr& Peers will prepare photometric calculations Our analysis will begin with reviewing existing <br /> in support of the street lighting and pedestrian documents as well as Orange County Flood <br /> scale lighting plans. Control drainage systems and as-built documents <br /> including review of topographic data and street <br /> The fallowing sheets are anticipated: improvement plans in the vicinity of the project <br /> • Street Lighting Plans (2) area that will be provided by the City to understand <br /> the flow patterns of the existing drainage area and <br />
The URL can be used to link to this page
Your browser does not support the video tag.