My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> HARK THOHAS <br /> • Electrical General Sheet (1) 7.4 Water Quality <br /> • Electrical Stormwater Pump Station Site 7.4.1 WQMP <br /> Plan (1) <br /> • Electrical Stormwater Pump Station Power Tetra Tech will prepare a WQMP for the project as <br /> Plan (1) required for urban runoff from municipal separate <br /> • Electrical Stormwater Pump Station Control storm systems (MS4 Permit). The scope of the <br /> Plan (1) WQMP shall include recommendation for post <br /> • Electrical Stormwater Pump Station construction permanent best management <br /> Lighting Plan (1) practices (BMP's), including source control <br /> • Electrical Stormwater Pump Station (structural and non-structural) and treatment <br /> Grounding Plan (1) BMPs. <br /> • Electrical Stormwater Tank Power and Scope assumes recommendations for BMPs shall <br /> Control Plan (1) be incorporated into the projects PS&E for the <br /> • Electrical Stormwater Control Building design tasks by Mark Thomas. Base project data <br /> Power Plan (1) for SWPPP preparation (areas, slopes, etc.) will be <br /> • Electrical Stormwater Control Building provided. <br /> Control Plan (1) Scope assumes SWPPP will be provided by the <br /> • Electrical Stormwater Control Building construction contractor per the RFP. <br /> Lighting Plan (1) <br /> • Electrical Stormwater Control Vault Power 7.4.2 Water Quality/BMP Plans <br /> and Control Plan (1) Mark Thomas will prepare construction drawings <br /> • Electrical Stormwater Control Vault Lighting for the Water Quality/BMP Plans for the 35%, <br /> Plan (1) 65%, 95%, 100%, and Final submittals. The <br /> • Electrical Single Line Diagram (1) Layout and details will be included in the Storm <br /> • Electrical Conduit Schedules (2) Drain Plans and Details as part of task 7.3.3. <br /> • Electrical Pump Control Schematic(1) 7.55 Planting & Irrigation <br /> • Electrical Details (3) <br /> • P&IDs (3) Mark Thomas will prepare Planting and Irrigation <br /> • Total sheets: 80 plans for the 35%, 65%, 95%, 100%, and Final <br /> submittals. a conceptual planting layout plan and a <br /> Tetra Tech will rely on geotechnical design plant palette for City review prior to proceeding <br /> parameters provided by Mark Thomas. with the 65% submittal. The following submittal <br /> It is assumed the Pump Station and retention milestones will incorporate updates based on the <br /> improvements are within properties that will be City's comments on the conceptual planting layout <br /> affected with the Project. Therefore, Tetra Tech will plan. The planting plans will include a complete <br /> prepare the needed plans for relocation or plant layout, plant callouts and notes, and quantity <br /> demolitions and re-establishment(such as sheets. Shrubs will be shown with hatch patterns <br /> irrigation, landscape, electrical services, lighting, in the PS&E package. <br /> gas services, communication, etc.). The irrigation layout will be prepared and will <br /> 7.3.3 Storm Drain Plans include irrigation head and valve locations, valve <br /> callouts, and paint-of-connection callouts and <br /> Mark Thomas will prepare construction drawings notes. Lateral line sizing and notation will be <br /> for the Storm Drain Plan relocations for the 35%, included at the 95% submittal. The irrigation <br /> 65%, 95%, 100%, and Final submittals. It is system is assumed to be a new system connecting <br /> assumed that the fallowing is required: to the existing water meters. <br /> • Plan and Profile sheets (5, 20 scale) If as-built drawings with sufficient information are <br /> • Detail sheets (2) not available, planting and irrigation removal and <br /> • Total Sheets: 7 repair areas will be identified with callouts only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.