Laserfiche WebLink
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> HART(THOHAS <br /> It is assumed that the following is required: 7.8 Construction Schedule <br /> • Irrigation Notes and Legend (1) Mark Thomas will provide a detailed CPM method <br /> • Irrigation Plans (4) schedule of construction activities in Microsoft <br /> • Irrigation Details (2) Project format based upon our assumed staging <br /> • Planting Notes and Legend (1) plans and design efforts. The initial Construction <br /> • Planting Plans (4) Schedule will be supplied at the 65% PS&E <br /> • Planting Details (1) submittal with updates with the 95%, 100%, and <br /> • Total sheets: 13 Final PS&E submittals that include a response to <br /> 7.6 Specifications comments from subsequent submittals. <br /> Mark Thomas will prepare specifications packages Task Deliverables: <br /> using the latest APWA Standard Specifications for • Concept Submittal to SCRRA <br /> Public Works Construction (Greenbook)ICaltrans • Planting Concept <br /> Standard Specifications and consistent with the • 30%160%190%01100%/Final Plan and Cost <br /> current City format. We anticipate the City will Estimate Submittals aligned with SCRRA <br /> provide the boilerplate contract documents to be • 60%190%1100% Specifications & <br /> included in the specifications package. We will Construction Schedule <br /> work with the City on assembling the entire <br /> contract document package. Specifications will be Task 8 Railroad & Structural Design <br /> provided, starting with full special 8.1 Track Plans <br /> provisions/technical specifications at the 65% <br /> PS&E submittal. The 95%, 100%, and Final PS&E 8.2 SCRRA Rail Bridge <br /> submittals will include a response to comments 8.2.1 Type Selection <br /> from subsequent submittals. <br /> Biggs Cardosa will develop a structure selection <br /> 7.7 Quantities & Cost Estimates analysis in accordance with §11.6.1 of the SCRRA <br /> A cost estimate will be prepared to inform the City Design Criteria Manual for the railroad bridge. <br /> of the upcoming financial obligation and to provide Along with discussing span arrangement, <br /> an engineer's estimate as a basis for the design. substructure configuration, etc., constructability will <br /> The estimate will show quantities and unit prices be a primary focus of the Bridge Type Selection <br /> for each work item along with appropriate Report. Attachments will include a Bridge General <br /> mobilization and contingency costs. For structural Plan and a rough order of magnitude construction <br /> items, Caltrans BEES format will be used. We will cost estimate. <br /> research the latest unit prices available, Caltrans Assumptions: <br /> database information and Caltrans latest . This scope does not anticipate the <br /> Construction Cost Manual, and consult with the preparation of multiple superstructure and <br /> City on specific prices and use our own information substructure alternatives. Rolled steel <br /> from other recent bids as available to ensure the beams are assumed to be the most <br /> unit prices are current. We will also coordinate and preferable alternative for SCRRA and the <br /> conduct value engineering studylanalysis for any City, and Type I or Type II CIDH or CISS <br /> proposed improvements during the design. The foundations will be preferrable over a pile <br /> estimate provided will be updated based on City <br /> comments and market data at the 35%, 65%, 95%, cap. <br /> 100%, and Final PS&E submittals That include a Up to three {3) construction staging <br /> response to comments from subsequent alternatives will be considered for the <br /> submittals. Bridge Type Selection Report. Alternatives <br /> are anticipated to include: 1) Piles located <br /> All estimate submittals will be both in excel and outside of tracks to minimize railroad work <br /> PDF formats with each submittal. windows, 2) piles located within tracks that <br /> would reduce structure cost but would <br />