My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> MARK TMGMAS <br /> require longer Limited Work Windows in Assumptions: <br /> addition to Absolute Work Windows, and 3) • The 35% Plans are anticipated to consist of <br /> an alternative that could eliminate the need the General Plan prepared for the Bridge <br /> to use Slide -In Bridge Construction. Type Selection Report and a Foundation <br /> • The rough order of magnitude construction Plan. <br /> cost estimate will be based on estimated • This scope assumes that the bridge <br /> costs per square foot. Detailed quantity drawings will be developed with traditional <br /> calculations and development of unit prices 2D linework, and Mark Thomas or others <br /> are not anticipated for this task. will use the 2D linework to develop 3D <br /> • This scope assumes one (1) round of models for visualization purposes. <br /> review comments from SCRRA and the • This scope assumes that the preferred <br /> City will be provided concurrently, or that alternative resulting from Task 8.2.1 is <br /> the City will review prior to submission to consistent with the general assumptions in <br /> SCRRA. this Scope of Work, and that the selected <br /> 8.2.2 Plan Preparation construction staging alternative will consist <br /> Biggs Card of constructing foundations outside of theosa will prepare plans and structural tracks and using Slide-In Bridge <br /> calculations for the railroad bridge. Plans are Construction methods. <br /> anticipated to include a General Plan, General 0 Structural calculations will be prepared in <br /> Notes, Foundation Plan, Bent and Abutment accordance with AREMA, SCRRA design <br /> Layouts, Staged Construction Details, and detail criteria, and Caltrans manuals. Structural <br /> sheets. calculations will be submitted at the 65% <br /> The following sheets (and number of sheets) are milestone (Draft), reconciled with the <br /> anticipated for the Santa Ana Boulevard independent structural check calculations, <br /> Underpass: and then a Final set of structural <br /> • General Plan (1) calculations will be prepared. The Final <br /> Structural Calculations will be signed and <br /> • Typical Sections (1) sealed by a licensed engineer in the State <br /> • General Notes (2) of California. <br /> • Construction Staging (8) Biggs Cardosa will supply plans and <br /> • Foundation Plan (1) structural calculations for inclusion in the <br /> • Abutment& Bent. Layouts and Details (8) SCRRA submittal packages at the City- <br /> • Girder Layout& Details (6) specified milestone submittal (e.g. the 65% <br /> • Bearing Details (2) plans will be packaged by other into a 60% <br /> • Walkway Details (1) SCRRA submittal). <br /> • Waterproofing Details (1) • Comments received on a milestone <br /> • Deck Drain Details (1) submittal will be addressed at the <br /> • Architectural 1 Aesthetic Details (2) subsequent submittal. This scope does not <br /> • Approach Slab Details (2) assume preparation of Draft 65% Plans <br /> • Total Sheets: 36 and Final 65% Plans, for example. <br /> To maintain independence for the check 8.2.3 Independent Check <br /> calculations, Biggs Cardosa recommends that the An independent design check of the rail bridge will <br /> 65% structural calculations be transmitted to the be performed in conformance with Caltrans Bridge <br /> City and SCRRA (if required), but the independent Design and Details Manual and SCRRA standards <br /> review team should not review until both firms are and design manuals. Calculations will be <br /> ready to reconcile structural calculations. performed to check the bridge layouts and <br /> structural integrity. Upon completion of the <br /> independent check, discrepancies between the <br />
The URL can be used to link to this page
Your browser does not support the video tag.