My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SORE 4F SERVICES <br /> SANTA ANA BOULEVARD GRADE SEPARATION z. <br /> MARK THOMAS <br /> • Log of Test Borings (6) Mark Thomas will perform an independent design <br /> • Total Sheets: 36 check of the Pavilion Structures in conformance <br /> 8.4.2 Independent Check (non-std walls) with CBC, CEBC, and ASCE 7 design <br /> requirements. The independent check will be <br /> Mark Thomas will perform an independent design completed by an engineer who was not involved in <br /> check of the retaining walls in conformance with the original design of the structure. Calculations <br /> Caltrans bridge design procedures. The will be performed to check the layouts and <br /> independent check will be completed by an structural integrity. Upon completion of the <br /> engineer who was not involved in the original independent check, discrepancies between the <br /> design of the structure. Calculations will be designer and checker will be reconciled and plans <br /> performed to check the layouts and structural updated. <br /> integrity. Upon completion of the independent 8•6 Aesthetics <br /> check, discrepancies between the designer and <br /> checker will be reconciled and plans updated. Structure aesthetics concept design and details will <br /> 8.5 Entry Pavilion/Canopy Remodel be prepared during PS&E for bridge and retaining <br /> walls, including up to one (1) plan sheet, one (1) <br /> Pavilion Structures work consists of removing section sheet and two (2) detail sheets to support <br /> existing Entry Pavilion and portion of existing the MT Transportation and Structure Team. The <br /> Canopy structure, replacing new Entry Pavilion aesthetic design scope assumes one design per <br /> Structure matching existing Entry Pavilion at the component, including the bridge barrier, pedestrian <br /> new entry location. Mark Thomas will prepare overcrossing barrier, fence, and retaining walls. <br /> structural calculations and plans for the Pavilion <br /> Structures. For the purposes of this scope of work, 8.7 Geotechnical Investigation & Report <br /> it is assumed that new Pavilion Entry Structure will Geotechnical design shall be conducted in <br /> match existing and City will provide all as-built conformance with current City, Caltrans, and <br /> plans for the existing Canopy structure and Entry SCRRA standards, design manuals„ and <br /> Pavilion Structure. The structure design will be in requirements. <br /> accordance with California Building Code (CBC, Consultant shall conduct a site visit to observe the <br /> 2025), California Existing Building Code (CEBC, <br /> 2025) and ASCE 7-22. It is assumed that the topography and visualize the proposed <br /> following plan sheets will be prepared: improvements at the project location. Consultant <br /> shall review available subsurface data from nearby <br /> Pavilion Structure Sheet Description structures or published geologic maps, to <br /> • Structural general notes, design criteria, determine general subsurface conditions at the <br /> special inspections (2) project site. Geotechnical borings shall be <br /> • Structural demolition plan (1) performed by the Consultant. <br /> • Demolition details, sequencing, temporary Consultant shall provide geotechnical, geologic <br /> shoring, and protection notes(1) and seismic design recommendations. Consultant <br /> • Structure Site Plan (1) shall provide geotechnical and foundation <br /> • Pavilion Foundation Plan (1) recommendations for roadway, bridges, retaining <br /> • Pavilion Roof Framing Plan (1) walls, and other structures as required. <br /> • Pavilion Elevation and Sections (1) Consultant shall prepare a preliminary <br /> • Platform Canopy Details (1) geotechnical report with information gathered <br /> • Canopy Foundation Plan and Framing during the site visit and review of existing <br /> Plan (1) subsurface data,geotechnical borings, results <br /> • Platform and Connection Details (1) obtained from the alternative analysis and the <br /> • Additional Concrete Details (1) preliminary bridge and retaining wall foundation <br /> • Additional Canopy Details (2) data. <br /> • Total Sheets: 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.