My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 8:22:25 AM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES CITY OFSANTAANA „ <br /> SANTA ANA BOULEVARD GRADE SEPARATION s <br /> HARK THOHAS <br /> Consultant shall prepare and submit a geotechnical Number of approximate <br /> review and exploration plan for the City to review. Design Element Borings Depth (feet) <br /> Consultant shall obtain right-of-entry permits prior <br /> to exploration. Geotechnical borings within the Rail Bridge and 2 125 <br /> railroad ROW or adjacent with the potential to foul Pedestrian Bridge 2 175 <br /> the tracks will require SCRRA review with right of <br /> entry permit, training, and flagging. To reduce the Retaining Walls 3 30 - �o <br /> delay in permitting and flagging time, borings will Roadway 3 5 - 10 <br /> be placed outside of the railroad ROW. Improvements <br /> Consultant shall conduct subsurface investigation Shoofly Track 2 10 <br /> per AASHTO requirement and evaluate the results Design <br /> in accordance with specified testing criteria. <br /> AASHTO requires a soil boring at each bridge <br /> support location where substructure width is less A qualified geotechnical engineer shall prepare a <br /> than 100 feet; minimum of two borings are required Geotechnical Report for foundation design of the <br /> per location where substructure width is greater bridges, retaining walls, pump station, and <br /> than 100 feet. Since the bridge substructure width, roadway pavement and embankment. Sufficient <br /> measured from one edge of the pedestrian bridge borings and material samples shall be taken to <br /> to the other edge of the railroad bridge, is less than determine the road structural section and slope <br /> 100 feet, one set of borings is sufficient for both stability. Consultant shall propose a Traffic Index <br /> bridges. (TI) for the all lanes and obtain City concurrence. It <br /> For retaining walls, a soil boring is required every shall be the responsibility of the Consultant to <br /> notify Underground Service Alert and provide <br /> 100 to 200 feet. For pavement, a boring shall be traffic control. Consultant shall tie position of <br /> performed every 500 to 750 feet. Based on this boring locations, with elevation. <br /> information, consultant's geotechnical field <br /> investigations plan is presented in the table below. The Foundation Report shall also include: <br /> The proposed approximate boring depths will be 0 Nature of materials found on the site. <br /> raised if refusal is encountered. The boreholes will • Liquefaction potential. <br /> be excavated using a truck-mounted or track- Any geological hazards that may exist and <br /> mounted drilling rig. Asphalt concrete cold-patch <br /> will be used to replace asphalt that is removed by recommend mitigation measures. <br /> Seismic design data in accordance with <br /> excavations. Consultant shall analyze the results <br /> and present them in the geotechnical report. The Caltrans 1 AREMA seismic design criteria. <br /> geotechnical report shall be prepared to include It shall be assured that the design parameters and <br /> recommendations for design and construction of potential construction difficulties are identified and <br /> bridge foundations, earth retaining structures, cut addressed, together with the proper mitigation <br /> and fill slopes, pavement, and drainage facilities measures in the Geotechnical Report. For the <br /> Results obtained from the field and laboratory bridge structure, alternative types of foundations <br /> testing shall be used to establish an idealized soil shall be evaluated to insure the selection of the <br /> profile and strength parameters for bridge and most suitable type of foundation. A log of Test <br /> retaining wall foundation design, and slope stability Borings sheet shall be prepared and included as <br /> and settlement calculations for the approaches. Part of the report and as part of the structure plans. <br /> Consultant shall provide information on This Log of Test Borings sheet shall be prepared in <br /> remediation measures if the site soils are corrosive accordance with Caltrans Standard Procedures. <br /> to concrete or steel structures. R-value shall be Laboratory Testing - Bulk and disturbed 1 <br /> used to determine composite pavement structural undisturbed samples shall be selected for <br /> sections using Traffic Indices. laboratory testing. All tests shall be <br />
The URL can be used to link to this page
Your browser does not support the video tag.