Laserfiche WebLink
SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION <br /> MARKTHOMAS <br /> • Investigate the impacts of the taking and/or Task 11 Traffic Management Plan <br /> relocation, if applicable, on the business's <br /> revenues and profits in the "after" Fehr& Peers will prepare a Traffic Management <br /> condition, taking into consideration Plan (TMP) to provide continuous traffic circulation <br /> potential betterment. and access, with space for safe and efficient <br /> • Implement valuation methods, such as the construction. The TMP will be coordinated with <br /> Income Approach (i.e., Discounted Cash project stakeholders to include but not be limited <br /> Flow Method, Capitalization of Cash Flow to: <br /> Method) and Market Approach (i.e., 1. Orange County Transportation Authority <br /> Discretionary Cash Flow Multiplier Method, (OCTA) <br /> EBITDA Multiplier Method), to determine 2. Southern California Regional Rail Authority <br /> the value of the business' goodwill in both (SCRRA) <br /> the before condition and in the after 3. California Public Utilities Commission <br /> condition. (CPUC) <br /> • Prepare a valuation report in compliance 4. California Department of Transportation <br /> with USPAP. (Caltrans) <br /> • Attend any required meetings or 5. Businesses <br /> conferences with the client to address 6. Local neighborhood associations, and <br /> appraisal-related questions. 7. Other public or private agencies/utilities or <br /> Deliverables: parties. <br /> • Up to 2 Billboard Goodwill Appraisals The development of the staged construction and <br /> • Up to 3 Business Goodwill Appraisals traffic detours, closures or alterations to traffic <br /> patterns will be included. The plan will detail the <br /> use of temporary traffic control devices, such as <br /> Task Deliverables: cones, drums, barricades, and signs, all of which <br /> • R/W Requirements Map will comply with the California MUTCD. Any <br /> • Legal Descriptions & Plats temporary roadway will be engineered to the same <br /> • Appraisal Maps &Appraisals design standards as new construction, including <br /> alignment, pavement, markings, and <br /> • Acquisition Documents pedestrianlbicycle facilities. <br /> Task 10 Utility Coordination The TMP shall be developed according to Caltrans <br /> This task continues utility coordination through the TMP Guidelines. TMP strategies include:1. Project Description <br /> final design, includes coordination of utility 2. Public Information <br /> relocation design and schedule, and supporting the 3. Motorist Information <br /> agreements. 4. Incident Management <br /> 10.1 Ongoing Utility Coordination 5. Construction Strategies <br /> 10.2 Utility Notifications &Conflicts 6. Demand Management <br /> 7. Alternate Routes (or Detours) <br /> 10.3 Utility Agreement Support 8. Layout Sheets <br /> Task Deliverables: 9, Typical Cross Sections <br /> 10. Project Schedule <br /> • Meeting Agendas, Minutes & Exhibits <br /> • Utility Notifications B&C, Response Log The Construction scenario in the Traffic/Circulation <br /> • Conflict Matrix Study Update is anticipated to evaluate the <br /> • Utility Agreement Supporting corridor with one lane in each direction. However, <br /> Documentation it assumed that some minor weekend and some <br /> lengthier full closures will be required due to <br /> staging. Fehr& Peers will coordinate with Caltrans <br />