SCOPE OF SERVICES CITY OFSANTAANA <br /> SANTA ANA BOULEVARD GRADE SEPARATION ■ <br /> NARKTNONAS <br /> related to full closures and potential impacts to 1-5 Task 14 Optional Tasks <br /> ramps. This scope of work assumes that a brief <br /> technical memorandum will provide enough Additional services may be provided under this <br /> evidence that traffic volumes at Santa Ana task on an as-needed basis. <br /> Boulevard and adjacent 1-5 interchanges are not 14.1 Construction Staking <br /> high enough to warrant a full detour assessment. <br /> Task Deliverables: Mark Thomas will provide one set of construction <br /> stakes or offset staking as directed by the <br /> • Draft and Final TMP Contractor or the City of Santa Ana. Construction <br /> Task 12 Agreements & Permits staking services will be performed in accordance <br /> 9 with the work as outlined in Chapter 12 of the <br /> The necessary third party permits for the design Caltrans Surveys Manual; Construction Surveys <br /> and construction will be obtained. and will consist of construction survey services, <br /> including field surveys and the necessary office <br /> 12.1 CPUC Go 88-B support to coordinate staking requirements with <br /> 12.2 SCRRA Rights of Entry the Resident Engineer. <br /> 12.3 Caltrans Encroachment Permit Mark Thomas will coordinate field staking with the <br /> Contactor and/or the City of Santa Ana. Field <br /> 12.4 C&M Agreement Support staking will begin two working days after receipt of <br /> Task Deliverables: staking request, assuming all clarifications and the <br /> • Draft and Final GO 88-B area is ready for staking. Mark Thomas will <br /> ' <br /> SCRRA Right of Entry (DES) prepare and maintain a spreadsheet tracking all <br /> written staking requests, dates of requests, dates <br /> • SCRRA Right of Entry {CON) of staking and all notes (cut sheets) regarding the <br /> • Caltrans Encroachment Permit(DES) staking. <br /> • Caltrans Encroachment Permit(CON) <br /> • C&M Agreement Supporting Documents Assumptions <br /> • Restaking due to lost or destroyed stakes <br /> Task 13 Bid & Construction Support will be performed as approved by the <br /> Support will continue through the bid and Contactor and will be compensated as <br /> construction phases of the project. extra work. <br /> • For the purposes of this proposal, one crew <br /> 13.1 Bid Support mobilization shall be defined as one day of <br /> 13.2 Conformed Documents continuous, uninterrupted staking effort to <br /> complete a staking priority. <br /> 13.3 Construction Support . After a survey request is received and if the <br /> Task Deliverables: survey field crews are mobilized to an area <br /> • Response to Contractor RFIs that is not ready for stakes, the Contractor <br /> • Contract Bid Review will be charged a minimum of 4 hours of <br /> field crew time as an extra above the <br /> • Review of Shop Drawings & Submittals contracted amount. <br /> • Construction Change Request Review . Mark Thomas will receive a 3-week look- <br /> • Additional Drawings/Exhibits ahead schedule of operations and time <br /> • As-Built Documents estimates and discuss staking <br /> need sloperations with Contractor <br /> • It is assumed stakes will be used within <br /> three working days of being set in order to <br /> preserve the integrity of the staking. <br />