My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Measure M2 Funding Eligibility 2026-27 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
06/02/2026 Regular
>
Item 18 - Measure M2 Funding Eligibility 2026-27 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 11:02:55 AM
Creation date
5/27/2026 11:01:31 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
18
Date
6/2/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> 4.0 Maintenance And Rehabilitation Strategies <br /> It is imperative for the City to receive the proper amount and type of funding to perform the M&R <br /> strategies as a plan to preserve the roadway pavement system in good condition. The plan is to <br /> apply a slurry seal coat to new or recently rehabilitated streets at regular intervals, usually seven <br /> to ten years. After a couple slurry seal coats, maintenance (thin) overlay or structural overlay <br /> shall be utilized to address structural issues. Every street will fail eventually or reach a point <br /> where it is more cost-effective to reconstruct than to repair. The roadway functional classification <br /> (refer to Section 3.0 Pavement Network) and the original design life of a particular street section <br /> will determine the intervals and treatment types. Additionally, streets with higher speeds, traffic <br /> volumes, and/or loads, will demand a larger pavement section. <br /> To account for the differences in pavement section across the spectrum of streets within the entire <br /> pavement network, the streets are grouped into M&R families according to their functional <br /> classification and/or surface type and a cost by condition is applied. The cost by condition for the <br /> arterial and local networks is shown in Table 4-1 and Table 4-2, respectively. These unit costs <br /> per SF include the soft costs of design, inspection, and construction engineering and are compiled <br /> utilizing current projects as a basis for costs. <br /> As the pavement ages, the PMP is designed to predict the roadway pavement's PCI based on <br /> the deterioration curves (refer to Section 2.0 Methodology). Additionally, the PMP, which is a tool <br /> to assist the City in making decisions when planning pavement M&R, involves scheduling <br /> pavement maintenance and rehabilitation before pavements deteriorate to a condition where <br /> reconstruction is the only solution. Based on Figure 2-1 in Section 2.0 Methodology showing how <br /> pavement generally deteriorates and the relative M&R cost (refer to Table 4-1 and Table 4-2) at <br /> various times throughout the pavement life, the critical PCI is established at 60. The critical PCI <br /> is defined as the PCI value after which the pavement section is expected to deteriorate rapidly <br /> with age, or the rate of PCI loss increases significantly with time, and the unit cost of repair greatly <br /> increases; therefore, the threshold for M&R decisions are considered at the critical PCI value <br /> since the cost of maintaining the pavement above the critical PCI value before the deterioration <br /> occurs is much less compared to maintaining pavements after substantial deterioration has <br /> occurred. Planned M&R strategies, essentially preventing pavements from reaching deteriorated <br /> conditions, helps the City stretch and maximize the use of City budgets and prolong the life of the <br /> pavements. StreetSaver utilizes the inventory database combined with the inspection <br /> information, M&R options along with their associated costs, and the deterioration curves <br /> predicting future pavement condition to calculate the chosen budget activity to reflect the best <br /> pavement management practices and costs. <br /> The City's PMP goal is to maintain a pavement system network with an optimal PCI of 75 ("Good" <br /> Condition) or better. The City's pavement system currently has 63 percent of the pavement <br /> sections in "Good" or "Very Good" condition (refer to Section 3.0 Pavement Network). The PMP <br /> will recommend priority list of maintenance treatments annually to bring all City streets to at least <br /> "Good" condition. The preventive M&R treatments, which are inexpensive treatments to extend <br /> pavement life cycle, have minimal costs since they are applied prior to pavement deterioration to <br /> "Poor" and "Very Poor" conditions. <br /> City of Santa Ana 2026 Pavement Management Program 4-4-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.