My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Measure M2 Funding Eligibility 2026-27 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2026
>
06/02/2026 Regular
>
Item 18 - Measure M2 Funding Eligibility 2026-27 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 11:02:55 AM
Creation date
5/27/2026 11:01:31 AM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
18
Date
6/2/2026
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br /> City of Santa Ana, CA Page 19 <br /> 2026 Citywide Pavement Management Plan - OCTA Submittal <br /> Final Report-March 16, 2026 <br /> CERTIFICATE CERTIFICATE <br /> Of Prequalification Of P-1-11ficitiun <br /> This certificate has been This cer4ficate has been <br /> presenled to prmaTed to <br /> Cade Bucknam Aaron Cohodas <br /> for successfully meeting the requirements of the for successfully meeting the requiiements of the <br /> OCTA 2025 Pavement Inspector Prequalification Program OCTA 2024 Pavement Inspector Prequalification Program <br /> using MANUAL survey techniques using MANUAL survey techniques <br /> EXPIRATION: EXPIRATION: <br /> 0.30.2027 7.30.2026 <br /> waver WestC—EC.eo VJ A <br /> CERTIFICATE CERTIFICATE <br /> Of Prequalification Of Prequalification <br /> Thiscertik,tehasbeen This Aiftva1vhusbeen <br /> presenled to presented W <br /> Chris Campbell Avery Brinkley <br /> for successfully meeting the requirements of the for successfully meeting the requirements of the <br /> OCTA 2026 Pavement Inspector Prequalification Program OCTA 2025 Pavement Inspector Prequalification Program <br /> using MAN UAL survey techniques using MANUAL survey techniques <br /> EXPIRATION: EXPIRATION: <br /> 6.30.2028 6.30.2027 <br /> ♦w✓vr.v✓�ztCoastEG<cm(ocrA WWw,WeslCodstECcom/OCTA <br /> d. Safety procedures—Bucknam field survey techniques utilize the following procedures: <br /> a. All vehicles are properly marked or flagged with appropriate sign markings indicating that <br /> a "PAVEMENT SURVEY IS IN PROGRESS"; <br /> b. All vehicles have the proper flashing amber light beacons placed on the top of the vehicle <br /> to allow for proper visibility and line-of-site warning; <br /> c. Large MPAH routes are surveyed using two field technicians to increase traffic control <br /> warning and safety; <br /> d. While parking or stopping along the survey route, vehicles legally park within the right- <br /> of-way or use a parking lot; <br /> e. All field technicians wear ANSI—105 Class 11 safety vests <br />
The URL can be used to link to this page
Your browser does not support the video tag.