My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-19
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2009
>
2009-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:54:34 PM
Creation date
10/18/2010 10:42:43 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
CUP06-21 VA00-0
Date
12/14/2009
Notes
2649 3/4 W First St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Branches should exceed all antennas by a minimum of 12 inches. <br />d. Branches should start at 15 feet above the ground. <br />e. There should be a minimum space of seven feet between the top of <br />the antenna and the top of the branches. <br />f. Branches should have an upward sweep similar to that of actual <br />Canary Island Pines. <br />g. Branch foliage color should be an olive green with some brown <br />"needles" to match an actual Canary Island Pine. A sample should be <br />submitted for approval prior to fabrication. <br />h. Full bark cladding with a custom color should be submitted for approval <br />prior to fabrication. <br />i. AI{ antennas shall be covered with "pine antenna socks" that match the <br />approved foliage color. <br />j. All "stand-off mounts" and support pipe mounts shall be concealed <br />behind antennas and painted a darker shade or green (or black) with a <br />• "flat" paint finish to reduce reflection and visibility of the mounting. <br />k. Include the tree specifications (selected manufacturers and models) <br />with photo simulations (also a site plan review requirement). <br />I. Show the location of the GPS antenna on all elevations. <br />m. Provide a "unistrut" detail for the utility cabinet; an "H-frame" is not <br />acceptable. <br />n. Provide a note on the plans stating "install underground utilities <br />sleeving for two carriers during construction of the structure". Shrouds <br />on the outside of the pole are not acceptable. <br />o. All exterior conduit and electrical meters shall be installed and <br />screened in one metal enclosure painted to match the structure. <br />6. The permit applicant recognizes that the frequencies used by the cellular <br />facility located at 26493/ West First Street are extremely close to the frequencies <br />used by the City of Santa Ana for Public Safety. This proximity will require <br />extraordinary "comprehensive advanced planning and frequency coordination" <br />engineering measures to prevent interference, especially in the choice of <br />• Resolution No. 2009-19 <br />Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.