Laserfiche WebLink
frequencies and radio ancillary hardware. This is encouraged in the "Best <br />Practices Guide" published by the Association of Public-Safety Communications <br />Officials-International, Incorporated (APCO), and as endorsed by the Federal <br />Communications Commission (FCC). Prior to the issuance of any permits to <br />install the facility, (permit applicant) shall meet in good faith to coordinate the use <br />of frequencies and equipment with the Communications Division of the Orange <br />County Sheriff-Coroner Department to minimize, to the greatest extent possible, <br />any interference with the Public Safety 800 MHz Countywide Coordinated <br />Communications System (CCCS). Similar consideration shall be given to any <br />other existing or proposed wireless communications facility that may be located <br />on the subject property. <br />7. At all times, the permit applicant shall not prevent the City of Santa Ana from <br />having adequate spectrum capacity on the City's 800 MHz radio frequency. <br />8. Before activating its facility, the permit applicant will submit to apost-installation <br />test to confirm that "advanced planning and frequency coordination" of the facility <br />was successful in not interfering with the City of Santa Ana Public Safety radio <br />equipment. This test will be conducted by the Communications Division of the <br />Orange County Sheriff-Coroner Department or aDivision-approved contractor at the <br />expense of the applicant. This post-installation testing process shall be repeated for <br />every proposed frequency addition and/or change to confirm the intent of the <br />"frequency planning" process has been met. <br />• <br />9. The permit applicant shall provide a 24-hour phone number to which interference <br />problems may be reported. This condition will also apply to all existing facilities in <br />the City of Santa Ana. <br />10. The permit applicant will provide a "single point of contact" in its Engineering and <br />Maintenance Departments to insure continuity on all interference issues. The name, <br />telephone number, fax number and a-mail address of that person shall be provided <br />to the City's designated representative upon activation of the facility. <br />11. The permit applicant shall insure that lessee or other user(s) shall comply with <br />the terms and conditions of this permit, and shall be responsible for the failure of any <br />lessee or other users under the control of permit applicant to comply. <br />12.The permit applicant shall provide a coverage and cell site location map for each <br />existing and proposed facility in Santa Ana. <br />• Resolution No. 2009-19 <br />Page 8 of 10 <br />