Laserfiche WebLink
Request for Proposal for 24 -Unit Single - Family Residential Development <br />Located at 1584 E. Santa Clara Avenue, Santa Ana, CA <br />Scope of Work <br />The City of Santa Ana is soliciting proposals from professional consulting firms for preparation of an <br />Initial Study and Focused Environmental Impact Report with supporting studies for a single family <br />residential project located at 1584 East Santa Clara Avenue in the City of Santa Ana. <br />The property is located within the Single Family Residential (R -1) zoning district and has a General Plan <br />designation of Low Density Residential (LR). The project proposes a vesting tentative tract map to <br />subdivide a 4.8 acre site into 24 parcels and the development of 24 single family residences ranging in <br />size from 2,460 to 2,760 square feet. The property is currently developed with an orange grove and single <br />family residence with detached garage. <br />Initial project analysis indicates that the Sexlinger family farmhouse and orange grove has been in <br />existence since roughly 1914 and appears to qualify as a Historic Resource under the California <br />Environmental Quality Act (CEQA). In addition, the City's Public Work's Agency has indicated that a <br />traffic study may also be required for the proposed project. <br />The selected firm shall prepare an Initial Study and focused Environmental Impact Report (EIR) for the <br />project. Staff has identified the various steps necessary in the compilation of the focused EIR. These <br />steps include: <br />1. Initiation of the Project/Mck -Off <br />Attend a kick -off meeting to discuss the project with City staff within five working days of receiving <br />a notice to proceed. At this time staff will present all information about the project, discuss any <br />project constraints and issues, and refine the scope and responsibilities. <br />2. Prepare Administrative Draft Initial Study/Proposed focused EIR <br />The firm shall prepare an Administrative Draft Initial Study /proposed EIR, which will include an <br />evaluation of the environmental resources contained in the City's CEQA Environmental Checklist. <br />The Initial Study shall include discussion of the existing conditions, impacts and magnitude of the <br />impacts, and the level of significance for each environmental discipline, as appropriate. Mitigation <br />measures shall be developed to reduce impacts to less than significant levels, where possible. This <br />scope includes preparation of detailed technical studies including: <br />a) Cultural Study <br />b) Traffic Study <br />c) Other studies deemed appropriate through the initial study <br />3. Prepare Mitigation Monitoring Plan <br />The firm shall prepare a Mitigation Monitoring Plan (MMP) for the project to include all accepted <br />mitigation measures and indication of the mitigation measure, project time period to which the <br />measure applies and responsible party and method of monitoring. <br />EXHIBIT 1 <br />19E -3 <br />