Laserfiche WebLink
Requested Plannine Services: <br />The preliminary framework for the Scope of Work for the project is as follows: <br />TASK 1: <br />INITIAL ANALYSIS AND FINALIZATION OF THE PROJECT PARAMETERS <br />TASK 1.1 — PROJECT KICK -OFF MEETING and STRATEGY SESSION #1• INITIAL <br />OPPORTUNITIES AND CONSTRAINTS <br />The project team will meet to kick -off the project. The purpose of this kick -off meeting <br />will be to ensure that all project participants agree with the project scope, the deliverables, <br />and the overall goals for this project. Each task of the project scope will be reviewed and <br />discussed to get a general consensus on the proposed task. The meeting will allow the City <br />to introduce the Corridor and provide the opportunity to discuss the initial opportunities and <br />constraints identified along the Harbor Boulevard Corridor. The City will share their initial <br />thoughts about their vision for the Corridor, and what opportunities and potential the <br />Corridor offers. The City will also share the constraints that have kept the Corridor <br />stagnant, and the opposition's view of the City's vision of the Corridor. A site visit along <br />the Corridor is optional. <br />TASK 1.2 — BASE MAPPING AND DOCUMENT COLLECTION <br />Base maps of the study corridor will be produced for use throughout all project tasks. These <br />maps should incorporate the study area of the corridor, and project team members should be <br />able to use the base maps to enhance any analysis or reports they will produce for other <br />tasks. The maps should also be easy to manipulate by project team members so the <br />visualization of any data or graphics can be incorporated onto the maps. <br />The City will make available all relevant studies, analyses, reports, maps, and/or data for <br />this task. <br />TASK 1.3 — DETAIL EXISTING LAND USE INVENTORY FOR PROJECT AREA <br />AND ADJACANT TRANSPORTATION ANALYSIS ZONES (TAZ) <br />Data will be gathered to conduct a detailed existing land use inventory for the project area <br />and adjacent transportation analysis zones (TAZ). The data will be provided by the City <br />and SCAG. The existing land use data will be incorporated into the Santa Ana Property <br />Information Network and SCAG's Sustainability Tool. <br />TASK 1.4 — INITIAL CORRIDOR - SEGMENT RETAIL ASSESSMENT <br />The selected consultant shall conduct a preliminary retail assessment along the corridor. <br />The assessment will include existing conditions of retail along the corridor. It will also <br />include a preliminary assessment of retail opportunities and constraints of the Corridor in <br />order to guide the rest of the study, and to provide a foundation of framework for the <br />supplemental tasks. <br />TASK 1.5 — REDEVELOPMENT POTENTIAL ANALYSIS <br />The selected consultant shall analyze the redevelopment potential of the Corridor. The <br />analysis will identify of potential redevelopment sites, different types of redevelopment, and <br />different samples of redevelopment completed on Corridors of the same characteristics. <br />