My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2010-11-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
11/15/2010
>
FULL PACKET_2010-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 5:00:45 PM
Creation date
11/10/2010 3:43:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
11/15/2010
Destruction Year
2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 1.6 — STRATEGY SESSION 42: OPPORTUNITY SITES AND PROJECT <br />PARAMETERS <br />This second meeting will allow the selected consultant to present their preliminary findings <br />for Task 1. The City will be able to provide feedback and comments in order to guide the <br />consultant in the subsequent tasks. This meeting will also provide the opportunity to <br />discuss the opportunity sites identified in Task 1.1 and compare them with the analyses <br />conducted in Tasks 1.3 -1.5. After these discussions, the selected consultant will be able to <br />move forward with the next tasks based on the opportunity sites agreed upon by the City as <br />the main project opportunity sites. <br />Project parameters will also be discussed and set at this meeting. These parameters shall be <br />agreed upon by the project team, so the selected consultant is able to build off their <br />completed tasks and guide the project towards the City's goals. <br />Deliverables: revised scope, base maps, reports /memos for retail assessment and <br />redevelopment potential <br />TASK 2: <br />ANALYSIS OF PHYSICAL ENVIRONMENT, SERVICES AND INFRASTRUCTURE <br />TASK 2.1 — IDENTIFICATION OF EXISTING CONDITIONS — PUBLIC <br />INFRASTRUCTURE. AIR QUALITY RECREATION /OPEN SPACE CULTURAL <br />RESOURCES, TRANSPORTATION ETC <br />The selected consultant shall identify the Corridor's existing conditions as it relates to <br />public services, air quality, recreation/open space, utilities, hydrology and water, cultural <br />resources, transportation, etc. within the defined study area that would impact feasibility of <br />Harbor Boulevard Mixed Use/ Transit Corridor Plan, <br />TASK 2.2 — IDENTIFICATION OF EXISTING INFRASTRUCTURE AND SERVICE <br />NEEDS, INCLUDING TRAFFIC IMPACTS <br />The selected consultant shall identify existing infrastructure and service needs, including <br />traffic impacts, for the proposed mixed use transit corridor plan. In addition, the consultant <br />shall include recommendations for best practices to promote sustainable communities <br />outcomes. <br />Deliverables: existing conditions assessment report <br />TASK 3: <br />VISIONING AND PUBLIC OUTREACH <br />TASK 3.1 — PUBLIC OUTREACH <br />Coordination between the project team and existing community organizations within the <br />vicinity of the Corridor is essential. Public outreach may include meetings, workshops or <br />charrettes. It is vital for outreach to occur relatively early in the study so public input can be <br />discussed among the project team and incorporated into the project's vision for the Harbor <br />Boulevard Corridor. A site walk along the Corridor, where local conditions can be <br />experienced and discussed within the boundaries of the study area, is an option. <br />
The URL can be used to link to this page
Your browser does not support the video tag.