Laserfiche WebLink
<br /> <br /> <br /> AECIIV <br /> <br /> preferred alternative. A schedule will be developed, <br /> maintained and updated for tracking the project. The aerial mapping will be prepared in conformance <br /> with Caltrans CAD mapping standards and <br /> Deliverables: photogrammetricspeclfications. Horizontal and <br /> • Required Copies ofMeetingMinutes vertical aerial control panels will be set to meet aerial <br /> • Updated Pro~ectSchedule triangulation requirements. The mapping will be <br /> • Public Meeting Exhibits prepared to 1" = 40' scale with 1-foot contours and will <br /> be delivered in a Microstation v8 format. <br /> Existing reports, studies, proposed and "as-built" plans, Survey crews will field verify the aerial mapping to <br /> mapping or other information will be obtained from the delineate planimetrics obstructed by tree coverage or <br /> City, utility companies and other agencies as applicable shadows and to verify the contours and spot elevations <br /> and reviewed by the design team. Data to be obtained generated from the aerial mapping. <br /> and reviewed includes: <br /> A color digital orthophoto with 3"pixel resolution will be <br /> • Mapping and design information from the City prepared from the 40-scale imagery. The digital <br /> for improvement projects; orthophoto will coverthe same mapping limits <br /> • Hazardous material/waste information; described above. <br /> • Preliminary materials (geotechnical) <br /> information; Deliverables: <br /> Traffic data (existing and forecasted traffic, ~ Aerial Mapping& Field Surveyin electronic and <br /> level of service, capacity adequacy, operational hard copy <br /> analysis, accidents, etc.); and DigitalOrtho Photo <br /> • Right-of-way and utility plans. <br /> <br /> We will prepare a traffic operations analysis for the <br /> <br /> <br /> <br /> Santa Ana Boulevard grade separation project. The <br /> Horizontal and vertical corridor control will be traffic operations analysis will examine existing and <br /> established along the corridor to support the aerial forecast future year conditions in the vicinity of the <br /> photogrammetry, land net surveys, engineering surveys OCTA/SCRRA at-grade crossing with Santa Ana <br /> and future design and construction activities along the Boulevard. The future year conditions examined will be <br /> corridor. The survey control will be set in accordance the project opening year and the project design year (20 <br /> with Caltrans survey standards and will be tied into the years after opening, assumed to be 2035). Conditions <br /> North American Datum of 1983 (NAD83 NSRS 2007) and examined will include the No Project Alternative and up <br /> the North American Vertical Datum of 1988 (NAVD88 to three build alternatives. <br /> Riverside County) or as specified by the client. <br /> The analysis will include examination of the following <br /> intersections: <br /> This task entails cadastral research within Caltrans <br /> District 12 and the County of Orange for existing ~ Santa Ana Bld./I-5 On and Off-ramp. <br /> centerline and right-of-way files and/or available Santa Ana Bld./Fuller St.. <br /> cadastral records in support of the centerline and right- Santa Ana Bld./Lincoln Ave. <br /> of-way of I-5, Santa Ana Boulevard, and Lincoln Street. Santa Ana Bld./Santiago Street. <br /> Field surveys will be performed to locate the centerline. We will coordinate with City staff and the PDTto develop <br /> In addition, key monuments will be located in order to an appropriate methodology for forecasting year 2035 <br /> calculate the centerline of the corridor and adjacent volumes at the study locations, relying on the SCAG RTP <br /> intersecting routes. The right-of-way will be based upon or OCTA OCTAM traffic model (or as the City requires) <br /> record calculations only and will not be surveyed. data to forecast year 2035 volumes. <br /> Aland net base map will be prepared at a scale Specific tasks to be performed for the traffic operations <br /> comparable to the aerial mapping and will include said analysis include the following: <br /> record centerlines and rights-of-way as well as <br /> underlying cadastral information, ownership 1. Peak period traffic counts will be collected at up to <br /> information as recorded with the Riverside County three study intersections, for two (a.m. and p.m.) <br /> assessor's office. All these data will be incorporated three-hour peak periods. The peak periods to be <br /> with the aerial mapping and delivered in a Microstation evaluated will be determined in conjunction with <br /> v8 format. the PDT. <br /> 2. Futureyeartrafficvolumesforthelocations <br /> identified for examination will be developed using <br /> r~i f~, <br /> fr. ~~,.~~.o~, <br /> <br /> Ii:~ir~l~~s~l fir p:~r~Ue~~ t~~y Re~~~r~: ~;q~uiiv~~e~~: ire ~ I::' i it p:~l~ins fair <br /> <br /> w,~~~ ir~~ Il~~l~v~ir~ r~~ e ~~~r~t'i~n I~° r~"eat <br /> ~ ~ ' <br />