Laserfiche WebLink
<br /> <br /> <br /> AECIM <br /> <br /> growth rates calculated from the RTP model SED, reconstruction of atemporary at-grade crossing to <br /> as described above. facilitate construction ofthe grade separation. <br /> 3. Future year traffic volumes will be developed for <br /> the four build alternatives described above. Railroad Permitting <br /> 4. Opening year traffic volumes will be developed We will be responsible for assisting the SCRRA/OCTA in <br /> using growth rates calculated from the RTP model obtaining the Agreement with the SCRRA/OCTA. This will <br /> SED for an intermediate year, to be determined by be done by: <br /> the PDT. <br /> 5. The resulting intersection levels of service will be Coordinate with the SCRRA/OCTA duringthe <br /> calculated using Highway Capacity Manual (HCM) development of the preliminary plan for the <br /> 2000 analysis methodologies. grade separation and solicit their input and <br /> 6. Based on the future levels of service, intersection separation requirements. <br /> lane geometrics will be identified to maintain <br /> minimum level of service standards. Request the SCRRA/OCTA to prepare the <br /> 7. The results of the traffic operations analysis will be Construction and Maintenance Agreement. <br /> presented in a technical study. This study will <br /> document the level of service analysis Meet and confer with the SCRRA/OCTA <br /> methodologies employed, existingtraffic regardingtheterms and conditions ofthe <br /> conditions, forecast future (openingyear and Agreement. <br /> design year) traffic conditions for each alternative, <br /> and improvements needed to maintain satisfactory Furnish plans and cost estimates to the <br /> operations in each analysis year. SCRRA/OCTA for said agreement. <br /> Deliverables: Coordinate with the Project Surveyor for the <br /> • Traffic Analysis legal descriptions for the permanent bridge <br /> • Traffic Management Plan crossing of the SCRRA/OCTA right of way and <br /> the temporary construction easement. <br /> <br /> <br /> 1~ ~ I L II~"I <br /> d ~II1111II ~I W, ~ Iwo' ' ~ ~~~~~'w~ • Monitor and coordinate the development of the <br /> I ~ III' " I~~!' ~ W~ III III III '~~i~ ri~~~ I ~M m~~~m II~~~~N~ wu,~ III III II ~6wu~ III III MI~~ <br /> Agreement with the SCRRA/OCTA and the City. <br /> • Keep City updated with regards to the progress <br /> Preliminary engineering will focus on the physical of the Agreement development. <br /> characteristics ofthe project area and the engineering <br /> features and standards required to develop the project. Make recommendations tothe City regarding <br /> The alternatives we will develop will need to address the terms of project specific conditions <br /> cost effective ways to resolve access issues, for both addressed in the Agreement. <br /> vehicle traffic and rail traffic, to the local businesses. <br /> They will also address the potential expansion/changing With City concurrence, negotiate with the <br /> needs of the SCRRA/OCTA. SCRRA/OCTA the terms of project specific <br /> Deliverables: conditions. <br /> • Preliminary Roadway Plans, Profile and Typical Coordinate with and provide assistance to the <br /> Sections <br /> City staff and City attorney regarding the terms <br /> of the agreement. <br /> Track Design Coordinate the development and approval by <br /> Provide track design plans, draft shoofly layout plans, to the SCRRA/OCTA of shoofly plans. Shoofly <br /> include shoofly track geometry plans, mainline track plans prepared by AECOM. <br /> geometry plans, shoofly typical sections, mainline <br /> typical sections, track grading plans, and special Coordinate the development and approval by <br /> trackwork plans. <br /> the SCRRA/OCTA of temporary at grade <br /> Railroad Coordination crossing for the shoofly. <br /> We will coordinate with the SCRRA/OCTA regarding <br /> alternative grade separation study alternatives, Deliverables: <br /> including additional trackage, construction activity ~ City/Railroad Construction and Maintenance <br /> constraints due to train operations, both freight and Agreement <br /> passenger trains, clearances, modifications to and <br /> r~i f~, <br /> fr. ~~,.~~.o~, <br /> <br /> Ii:~ir~l~~s~l fir p:~r~Ue~~ t~~y Re~~~r~: ~;q~uiiv~~e~l~: ire ~ I::' i p:~l~ins fair <br /> <br /> w,~~~ ir~~ Il~~l~v~ir~ r~~ e ~~~r~~~'i~n I~° r~"e~~~ <br /> ~ ~ ' <br />