Laserfiche WebLink
<br /> <br /> <br /> AECIM <br /> <br /> using primarily project layouts/graphics <br /> Tasks associated with completion of the proposed work provided byAECOM, sign in sheet, and <br /> effort are as follows: comment cards) <br /> • Attendance at informational meetingby the <br /> Environmental TaskManagerand one <br /> After receiving a notice to proceed and preliminary additional ICFJones & Stokes staffinember, if <br /> layout from AECOM for the build alternative, a Caltrans needed <br /> Preliminary Environmental Study (PES) form will be Direct mailing to propertyownersand residents <br /> prepared for submittal to City and Caltrans for review. located within 500 feetof the proposed project <br /> The purpose of the PES is to identify and receive (assumed thatAECOM'sright-of way <br /> concurrence from Caltrans regarding the technical consultantorthe City will provide the listof <br /> studies that will need to be prepared for the proposed owners and addresses) <br /> project and to receive concurrence regardingthe Preparation and publication ofineetingnotice <br /> environmental document to be prepared. The PES will once foreach meetingin one English and one <br /> be prepared using existing, available information and no Spanish language newspaper(assumed that <br /> new analyses or detailed evaluations are assumed or City will pay the newspaperdirectlyforthe <br /> included. As directed in the PES, cultural information publication) <br /> will be provided entirely by Caltrans. The PES will be <br /> revised twice following Caltrans review. Figures will <br /> include a vicinity map, a location map, and the layout All technical studies will be consistent with meeting the <br /> provided by AECOM. No additional figures or graphics requirements of CEQA and NEPA, as well as those of <br /> are assumed to be necessary. related environmental statutes and regulations. The <br /> technical studies will be prepared to cover both related <br /> Deliverables: statutory documentation requirements and to support <br /> • Draft, revised Draft, and Final PES, preparation of a joint NEPA/CEQA document required <br /> for project approval. <br /> Although not legally required for the level of Preparation of all technical analyses and reports will <br /> environmental document that is proposed, it is assumed follow local, state, and federal environmental <br /> that two public information meetings will be conducted guidelines, primarily consisting of the Caltrans <br /> for the proposed project. One at the outset of the Standard Environmental Reference (SER) website, <br /> project after the build alternative has been developed, Caltrans Project Development Procedures Manual, local <br /> and one during the PA/ED process at times to be and state CEQA Guidelines, and FHWA Technical <br /> determined by the City and Caltrans. The meetings will Advisory 6640.81 Guidance on Preparing and Processing <br /> utilize boards that present the project alternative. ICF Environmental and Section 4(f) Documents. The <br /> Jones & Stokes will assist the City and Caltrans in formats to be used for the technical studies will follow <br /> organizing and holding the informational meetings. It is the guidance available on the Caltrans SER website as <br /> assumed that the City will secure the location for the of the date that those studies are initiated. <br /> public meeting. For each meeting a notice will be <br /> prepared by ICF Jones & Stokes for publication in a Please see scope of work for each technical study for <br /> newspaper of local circulation (Orange County Register, details regarding studies to be prepared. <br /> etc.). This notice will be submitted to the City and <br /> Caltrans for review and approval. It is assumed that ICF Unless otherwise noted, the deliverables for the <br /> Jones & Stokes will coordinate publication of the notice following technical studies will be a separate bound <br /> in the newspaper and that the City will be responsible report including a standardized project description, a <br /> for paying the newspaper directly for the publication methodology relevant to each topic area, description of <br /> cost. It is assumed that the notice will be published in the affected environment, impact assessment, and <br /> one English and one Spanish language newspaper. ICF mitigation measures. The screencheck technical study <br /> Jones & Stokes will prepare asign-in sheet, comment will be submitted to the City (two copies) and to <br /> cards, and up to three display boards using project Caltrans (four copies) for concurrent review. Following <br /> layouts/graphics provided by AECOM. In addition, direct City and Caltrans review a Draft of each technical study <br /> mailings to property owners and residents living within will be submitted to the City (two copies) and to <br /> 500 feet of the proposed project will be distributed Caltrans (four copies) for concurrent review. Following <br /> using a mailing list generated and provided by AECOM's Caltrans and City second review it is assumed that a <br /> right-of-way consultant or the City. No other direct revisions workshop will be held to address any <br /> mailings are assumed. It is assumed that ICF Jones & outstanding comments, if any comments remain. <br /> Stokes Project Manager along with one additional Following the revisions workshop a final version of each <br /> individual, if needed, will attend the meetings. report will be prepared. The final technical studies (two <br /> copies to the City and four copies to Caltrans) will be <br /> Deliverables: submitted following the workshop for final concurrence <br /> • Meeting Materials (up to three 3Ox4Oboards <br /> r~i f~, <br /> fr. ~~,.y~on, <br /> <br /> Ii:~ir~l~~s~l ~~r p:~r~Ue~~ t~~y Re~~~r~: ~;q~uiiv~~e~~: ire ~ I::' i p:~l~ins fair <br /> <br /> w,~~~ ir~~ Il~~l~v~ir~ r~~ e ~~~r~~~'i~n I~° r~"e~~~ <br /> ~ ~ ' <br />