My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> AECIIV <br /> <br /> the circulation period and coordination, and if any Environmental Commitments Record <br /> changes to the project have occurred. Also, included For the project an environmental commitments record <br /> will be a Draft Finding of No Significant Impact (EONS/). (ECR) will be prepared in a matrix table format and <br /> ICF Jones & Stokes will submit the Draft Final EA/EONS/ included as an appendix in the EA/EONS/. It is assumed <br /> to the City and Caltrans for review. Along with the Draft that the ECR will be reviewed as part of the EA/EONS/. <br /> Final EA/EONS/, the external QA/QC form and The matrix table will include a description of each <br /> environmental document checklist will be prepared and mitigation measure organized by topic numbered to <br /> submitted. The QA/QC form and checklist are assumed correspond with the impacts. For each mitigation <br /> to be included with each submittal. Followingthe measure, the Reporting Process, Timing of Measure, <br /> incorporation of one set of comments from the City and Responsible Party, and Verification of Compliance will <br /> Caltrans a revised Draft Final MND/EONS/ will then be be identified through coordination with resource <br /> prepared and submitted to Caltrans along with a agencies and experience on other similar projects. <br /> response to comments document for concurrence and <br /> for conducting the NEPA QC review. Following the Deliverables: <br /> Caltrans NEPA QC review the Final EA/EONS/ will be Included in Final EA/EONS/ <br /> prepared and submitted to the City and Caltrans for <br /> review. It is assumed that no additional comments will <br /> be received. ICF Jones & Stokes will prepare a notice for publication <br /> in the Federal Register by FHWA to start the NEPA <br /> Deliverables (two copies City; eightcopies Caltrans): statute of limitations. This notice will be prepared in <br /> • Draft Final EA/EONS/ compliance with the SER and it is assumed that a Draft <br /> • Revised Draft Final EA/EONS/ and Final version of the notice will be prepared and that <br /> • Final Draft Final EA/EONS/for coordination and publication of the notice will be the <br /> approval/concurrence responsibility of Caltrans and FHWA. <br /> • Final EA/EONS/ (70 hard copies and 70 CDs with <br /> pdf version) Deliverables: <br /> • Draft and Final Federal Register Notice (all <br /> transmittals assumed to be done <br /> electronically) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> r~~ f~ <br /> fr. ~~,.~~.o~, <br /> <br /> ~ <br /> Ii:~ir~l~~s~l ~~r p:~r~Ue~~ t~~y Re~~~r~: ~;q~uiiv~~e~~: ire ~ I::' i p:~l~ins fair <br /> w ir~~ Il~~l~v~ir~ r~~ e~~~~r~ti~n I r~~e~t <br />
The URL can be used to link to this page
Your browser does not support the video tag.