My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> It will be Ms. Colburn's responsibility to chair meetings, periodically (maybe even monthly beginning when the <br /> technical reports are close to submission to the District) with the District 8 Environmental Staff to address issues, <br /> comments, and to answer questions. Ms. Colburn will also be tasked to review each and every Technical Report written <br /> by our environmental subconsultant prior to submission to the District, and to perform this review with an eye towards <br /> commenting on what the Caltrans reviewer would comment on for the initial submittal of these reports- In this manner, <br /> Ms. Colburn will be able to perform a Caltrans-style review of the reports prior to submission to Ca/trans. This <br /> process should ensure the team only receives a limited set of comments once the reports are submitted to Caltrans, that <br /> can be easily addressed, and therefore the approval of the report should be expected by the CITY upon the second <br /> submission. Ms. Colburn is uniquely qualified for this role, having served in the District for a number of years <br /> providing these type of services while being employed by Caltrans. Our team, and this project, will greatly benefit from <br /> the experience Ms. Colburn will be able to apply towards a more efficient and streamlined environmental process. In <br /> this way, the CITY can benefit by expecting the environmental approval sooner, rather than later. <br /> The environmental subconsultant, ICF Jones &C Stokes, will perform the following specific scope of work required to <br /> complete the environmental documentation for the proposed project. Additional tasks or effort not specifically <br /> identified in this scope of work is not assumed or implied. <br /> Tasks associated with completion of the proposed work effort are as follows: <br /> Environmental Document Project Management/Coordination/Meetings <br /> ICF Jones &L Stokes scope of work for quality control, progress reporting, schedules, and coordination/ meetings is <br /> outlined below. <br /> • Quality Control: ICE Jones &L Stokes project manager will be responsible for directing and implementing the <br /> project's environmental quality control program. Senior technical reviewers in each discipline will review each <br /> work product, including field methods, data collection, analysis, report writing, and any subcontracted work <br /> studies. In addition, a technical editor will review all reports to ensure consistent use of terminology and style as <br /> well as general readability for the target readers. Finally, the project manager will review all documents before <br /> they are submitted to the City and Caltrans. <br /> • Environmental Schedule: ICF Jones &L Stokes will prepare a comprehensive environmental process schedule in <br /> consultation with City and Caltrans staff- As conditions change during the project, ICF Jones &L Stokes will update <br /> and fine-tune the schedule, with concurrence of AECOM and the City. It is assumed that the schedule will be <br /> refined up to four times. <br /> • Kick-off Meeting: ICE Jones &b Stokes Project Manger shall attend a kick-off meeting. Time reflected in the <br /> attached cost estimate includes meeting preparation time. It is assumed that AECOM will prepare the meeting <br /> minutes for this meeting. <br /> • Monthly PDT Meetings: ICE Jones &b Stokes Project Manager shall attend Project Development Team (PDT) <br /> meetings with the City, AECOM, and Caltrans staff (attendance at twenty-eight [28] PDT meetings by the ICF <br /> Jones &L Stokes Project Manager is assumed). <br /> • Meetings: ICF Jones &L Stokes Project Manger may be required to attend meetings in addition to the PDT <br /> meetings previously identified. It is assumed that the ICE Jones &L Stokes Project Manager will attend up to twelve <br /> (12) additional project meetings. <br /> • Project Management: This task includes the coordination and management efforts by the ICF Jones &b Stokes <br /> Project Manager. A duration of twenty-eight (28) months is assumed. <br /> Deliverables: Environmental schedule. <br /> Environmental PM Attendance at kick off meeting, twenty-eight (28) PDT <br /> meetings, and twelve (12) project related meetings. <br /> Project management. <br /> Cin, of S-t, A- <br /> 25G-161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.