My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> Preliminary Environmental Study <br /> After receiving a notice to proceed and preliminary layout from AECOM for the build alternative, a Caltrans <br /> Preliminary Environmental Study (PES) form (November 20, 2007) will be prepared. for submittal to City and Caltrans <br /> for review. The purpose of the PES is to identify and receive concurrence from Caltrans regarding the technical studies <br /> that will need to be prepared for the proposed project and to receive concurrence regarding the environmental <br /> document to be prepared- The PES will be prepared using existing, available information and no new analyses or <br /> detailed evaluations are assumed or included. As directed in the PES, cultural information will be provided entirely by <br /> Caltrans. The PES will be revised twice following Caltrans review. Figures will include a vicinity map, a location <br /> map, and the layout provided by AECOM. No additional figures or graphics are assumed to be necessary. <br /> Deliverables: <br /> • Draft, revised Draft, and Final PES. <br /> Public Information Meetings <br /> Although not legally required for the level of environmental document that is proposed, it is assumed that two public <br /> information meetings will be conducted for the proposed project. One at the outset of the project after the build <br /> alternative has been developed, and one during the PA/ED process at times to be determined by the City and Caltrans. <br /> The meetings will utilize boards that present the project alternative. ICE Jones & Stokes will assist the City and <br /> Caltrans in organizing and holding the informational meetings. It is assumed that the City will secure the location for <br /> the public meeting. For each meeting a notice will be prepared by ICF Jones & Stokes for publication in a newspaper <br /> of local circulation (Orange County Register, etc.). This notice will be submitted to the City and Caltrans for review <br /> and approval. It is assumed that ICF Jones & Stokes will coordinate publication of the notice in the newspaper and that <br /> the City will be responsible for paying the newspaper directly for the publication cost. It is assumed that the notice will <br /> be published in one English and one Spanish language newspaper. ICF Jones & Stokes will prepare a sign-in sheet, <br /> comment cards, and up to three display boards using project layouts/graphics provided by AECOM. In addition, direct <br /> mailings to property owners and residents living within 500 feet of the proposed project will be distributed using a <br /> mailing list generated and provided by AECOM's right-of-way consultant or the City. No other direct mailings are <br /> assumed. It is assumed that ICF Jones & Stokes Project Manager along with one additional individual, if needed, will <br /> attend the meetings. <br /> Deliverables: <br /> • Meeting Materials (up to three 30x40 boards using primarily project layouts/graphics provided by AECOM, sign in <br /> sheet, and comment cards) <br /> • Attendance at informational meeting by the Environmental Task Manager and one additional ICF Jones & Stokes <br /> staff member, if needed <br /> • Direct mailing to property owners and residents located within 500 feet of the proposed project (assumed that <br /> AECOM's right-of-way consultant or the City will provide the list of owners and addresses) <br /> . Preparation and publication of meeting notice once for each meeting in one English and one Spanish language <br /> newspaper (assumed that City will pay the newspaper directly for the publication) <br /> Technical Studies <br /> All technical studies will be consistent with meeting the requirements of CEQA and NEPA, as well as those of related <br /> environmental statutes and regulations. The technical studies will be prepared to cover both related statutory <br /> documentation requirements and to support preparation of a joint NEPA/CEQA document required for project <br /> approval. <br /> Preparation of all technical analyses and reports will follow local, state, and federal environmental guidelines, primarily <br /> consisting of the Caltrans Standard Environmental Reference (SER) website, Caltrans Project Development Procedures <br /> Manual, local and state CEQA Guidelines, and FHWA Technical Advisory 6640.81 Guidance on Preparing and <br /> Processing Environmental and Section 4(f) Documents. The formats to be used for the technical studies will follow <br /> the guidance available on the Caltrans SER website as of the date that those studies are initiated. <br /> Please see scope of work for each technical study for details regarding studies to be prepared. <br /> Cily q/ Santa A.m <br /> 25G-162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.