My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - ENGINEERING SRVS GRADE SEPARATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/04/2011
>
25G - ENGINEERING SRVS GRADE SEPARATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:55:46 PM
Creation date
1/4/2011 7:05:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> Unless otherwise noted, the deliverables for the following technical studies will be a separate bound report including a <br /> standardized project description, a methodology relevant to each topic area, description of the affected environment, <br /> impact assessment, and mitigation measures. The screencheck technical study will be submitted to the City (two <br /> copies) and to Caltrans (four copies) for concurrent review. Following City and Caltrans review a Draft of each <br /> technical study will be submitted to the City (two copies) and to Caltrans (four copies) for concurrent review. <br /> Following Caltrans and City second review it is assumed that a revisions workshop will be held to address any <br /> outstanding comments, if any comments remain- Following the revisions workshop a final version of each report will <br /> be prepared. The final technical studies (two copies to the City and four copies to Caltrans) will be submitted <br /> following the workshop for final concurrence (no additional comments are assumed to be received associated with the <br /> final concurrence review). <br /> For this scope of work, the technical studies for which a specific scope of work has been included have been assumed <br /> based on a review of existing project information. If additional studies are identified during the environmental phase of <br /> the project a scope of work and cost will be submitted for approval prior to their initiation. <br /> Deliverables: Screencheck technical studies (6 copies each) <br /> Draft technical studies (6 copies each) <br /> Final technical studies for concurrence (6 copies each) <br /> Final approved technical studies (6 copies each) <br /> The following assumptions have been made with regard to the technical studies that are to be prepared: <br /> • Engineering plans, including limits of construction, staging areas, and borrow/disposal sites, if needed, will be <br /> provided by the engineering team at a level of detail sufficient for preparing the technical studies (roadway lanes, <br /> topographic information [including changes in topography resulting from the proposed project], state plane tick <br /> marks, station numbers, and existing structures within 500 feet of the proposed project). <br /> • Mapping showing existing conditions (roadway lanes, topographic information, state plane tick marks, station <br /> numbers, and existing structures within 500 feet of the proposed project) will be provided by the engineering team. <br /> • Cross sections along the alignment showing existing and proposed conditions at an interval sufficient for preparing <br /> the noise analyses will be provided by the engineering team. <br /> • Aerial photograph at a scale suitable for preparation of project mapping, figures, and analyses will be provided by <br /> the engineering team (1 inch=200 feet scale minimum, with a minimum of 500 feet to the east and west of Pine <br /> Avenue shown and any other areas of improvement). Pixel size shall be no more than 2.5 square feet and image <br /> shall be orthorectified. <br /> • Focused protocol surveys for any species are not included in this scope and cost, other those specified under the <br /> Natural Environment Study scope. If additional focused surveys are identified during the biological field <br /> reconnaissance then this will be communicated to AECOM and the City and a scope and cost for this work will be <br /> provided. <br /> • Geotechnical, traffic assessments, Storm Water Data Report (SWDR) and/or Water Quality Report, and any <br /> floodplain analyses/technical reports (Location Hydraulic Study and Summary Floodplain Encroachment Report or <br /> Floodplain Evaluation Report), if required, will be provided by AECOM and these analyses will be provided to <br /> ICE Jones & Stokes for incorporation into the environmental document and for use in the technical analyses. <br /> • Traffic information shall contain 24-hour and hourly traffic counts separated by direction and vehicle classification <br /> (autos, medium trucks, heavy trucks) over at least three weekdays, along with peak hour and average daily traffic <br /> (ADT) forecast traffic volumes for existing conditions, opening year, and design year with and without the project <br /> for roads in the project area, and posted speeds. In addition, subregional/regional traffic information will be <br /> provided that includes vehicle miles travelled (VMT) data for existing year, opening year (build and no-build) and <br /> horizon year (build and no-build) broken down into five mph speed bins. This data is needed in order to evaluate <br /> Cirt, o/ Sanra An, <br /> 25G-163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.