My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:51 PM
Creation date
1/13/2011 3:55:04 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Contract #
N-2011-004
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />4. Signatures of the author(s) and approval(s) from responsible supervisors. <br />5. Table of contents. <br />6. Description, content, drawings, and schematics as applicable. <br />A minimum of four (4) hard copies and one electronic copy (in a media format as <br />approved by the AUTHORITY in writing) of each deliverable shall be provided, <br />unless otherwise specified in the SOW. CONSULTANT shall also keep a history <br />matrix of all deliverables related to the SOW. CONSULTANT shall provide <br />AUTHORITY with copy of history matrix in hard copy and/or electronic format <br />upon request. <br />6.2 LIST OF PROJECT DELIVERABLES <br />DELIVERABLE <br />TASK <br />TITLE <br />SECTION <br />SECTION 2.0 PROJECT MANAGEMENT <br />1 <br />Work Plan (NTP + 15 Days) <br />2.2.6 <br />2 <br />Project Schedule (NTP + 15 Days) <br />2.2.7 <br />3 <br />Final Deliverables List (NTP + 15 Days) <br />2.2.8 <br />4 <br />Monthly Progress Reports <br />2.2.9 <br />5 <br />Action Item Matrix <br />2.2.12 <br />6 <br />Final Technical Reports <br />2.2.13 <br />SECTION 3.0 TRAFFIC SIGNAL SYNCHRONIZATION DESIGN FINALIZATION <br />A6a <br />Bristol/State College BRT Corridor - Technical <br />7 <br />memorandum detailing findings of the design <br />3.1 .6 <br />phase documentation review <br />Bristol/State College BRT Corridor - All Final <br />optimized and synchronized traffic signal timing <br />plans in Synchro format and the preferred timing <br />8 <br />A7a <br />chart format of each agency, including (a) <br />3.1 <br />existing corridor conditions and (b) planned and <br />.7 <br />programmed improvements (widening projects <br />and intersection improvements) within the next <br />five years after NTP). <br />Scope of Work 105 05/18/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.