My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 4:45:51 PM
Creation date
1/13/2011 3:55:04 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (C-9-0824)
Contract #
N-2011-004
Agency
PUBLIC WORKS
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />9 <br />A7b <br />Bristol/State College BRT Corridor - Final Time- <br />3.1 <br />Space Diagrams <br />.7 <br />10 <br />A7c <br />Bristol/State College BRT Corridor - Final Signal <br />3.1 <br />Timing Optimization Plan <br />.7 <br />11 <br />A7d <br />Bristol/State College BRT Corridor - Electronic <br />3.1 <br />Synchro 7.0 data files used in the Final analysis <br />.7 <br />12 <br />A7e <br />Bristol/State College BRT Corridor - Electronic <br />3.1 <br />Sim Traffic data files used in the Final analysis <br />.7 <br />Bristol/State College BRT Corridor - Electronic <br />13 <br />Alf <br />Versions of the Final analysis and all data files <br />3.1 .7 <br />including the Tru-Traffic TS/PP files <br />14 <br />A8a <br />Bristol/State College BRT Corridor - Project <br />3.1 <br />Meeting Agendas <br />.8 <br />15 <br />A8b <br />Bristol/State College BRT Corridor - Project <br />3.1 <br />Meeting Minutes and Action Items <br />.8 <br />16 <br />A8c <br />Bristol/State College BRT Corridor - Action Item <br />3.1 <br />Matrix <br />.8 <br />B6a <br />Harbor Boulevard BRT Corridor - Technical <br />17 <br />memorandum detailing findings of the design <br />3.2.6 <br />phase documentation review <br />Harbor Boulevard BRT Corridor - All Final <br />optimized and synchronized traffic signal timing <br />plans in Synchro format and the preferred timing <br />18 <br />67a <br />chart format of each agency, including (a) <br />3.2.7 <br />existing corridor conditions and (b) planned and <br />programmed improvements (widening projects <br />and intersection improvements) within the next <br />five years after NTP . <br />19 <br />67b <br />Harbor Boulevard BRT Corridor - Final Time- <br />3.2.7 <br />Space Diagrams <br />20 <br />67c <br />Harbor Boulevard BRT Corridor - Final Signal <br />3.2.7 <br />Timing Optimization Plan <br />21 <br />B7d <br />Harbor Boulevard BRT Corridor - Electronic <br />3.2.7 <br />Synchro 7.0 data files used in the Final analysis <br />22 <br />B7e <br />Harbor Boulevard BRT Corridor - Electronic Sim <br />3.2.7 <br />Traffic data files used in the Final analysis <br />Harbor Boulevard BRT Corridor - Electronic <br />23 <br />B7f <br />Versions of the Final analysis and all data files <br />3.2.7 <br />including the Tru-Traffic TS/PP files <br />24 <br />B8a <br />Harbor Boulevard BRT Corridor - Project Meeting <br />3 2 8 <br />Agendas <br />25 <br />B8b <br />Harbor Boulevard BRT Corridor - Project Meeting <br />3 2 8 <br />Minutes and Action Items <br />Scope of Work 106 05/18/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.