Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />39 <br />A2b <br />Bristol/State College BRT Corridor — Copies of All <br />4.2.1 <br />Purchase Orders and Product Manuals <br />40 <br />A3a <br />Bristol/State College BRT Corridor - Signal <br />4.2.2 <br />Synchronization Equipment Installation Schedule <br />Bristol/State College BRT Corridor - Signal <br />41 <br />A4a <br />Synchronization Equipment <br />4.2.3 <br />AUTHORITY/agencies Notifications <br />Bristol/State College BRT Corridor - Signal <br />42 <br />A5a <br />Synchronization Equipment Guarantee <br />4.2.5 <br />Certification <br />43 <br />A6a <br />Bristol/State College BRT Corridor - "After" Study <br />4.2.6 <br />Project Report <br />Bristol/State College BRT Corridor - Electronic <br />44 <br />A6b <br />versions of the "After' Study analysis and all <br />4.2.6 <br />floating car data files <br />Bristol/State College BRT Corridor - Draft <br />45 <br />A7a <br />Bristol/State College BRT Corridor Final Timings <br />4.2.7 <br />and Evaluation Technical Report <br />Bristol/State College BRT Corridor - Final <br />46 <br />A7b <br />Bristol/State College BRT Corridor Final Timings <br />4.2.7 <br />and Evaluation Technical Report <br />Bristol/State College BRT Corridor - <br />47 <br />A7c <br />Presentations to the AUTHORITY and City <br />4.2.7 <br />Councils <br />48 <br />A8a <br />Bristol/State College BRT Corridor - Project <br />4.2.8 <br />Meeting Agendas <br />49 <br />A8b <br />Bristol/State College BRT Corridor - Project <br />4.2.8 <br />Meeting Minutes and Action items <br />50 <br />A8c <br />Bristol/State College BRT Corridor - Action Item <br />4.2.8 <br />Matrix <br />Harbor Boulevard BRT Corridor - Technical <br />memorandum containing field implementation of <br />optimized traffic signal plans for existing corridor <br />51 <br />B1a <br />conditions, including all required fine tuning and <br />4.3.1 <br />timing charts as requested by AUTHORITY and <br />agency, and final signal timing implementation <br />Ian. <br />52 <br />62a <br />Harbor Boulevard BRT Corridor - List of <br />4.3.2 <br />Materials, Units, and Prices <br />53 <br />B2b <br />Harbor Boulevard BRT Corridor — Copies of All <br />4.3.2 <br />Purchase Orders and Product Manuals <br />54 <br />B3a <br />Harbor Boulevard BRT Corridor - Signal <br />4.3.3 <br />Synchronization Equipment Installation Schedule <br />Scope of Work 108 05/18/10 <br />