Laserfiche WebLink
MEMORANDUM OF UNDERSTANDING NO. C-9-0824 <br />EXHIBIT A <br />26 <br />B8c <br />Harbor Boulevard BRT Corridor - Action Item <br />3 2 8 <br />Matrix <br />Westminster/17 Street BRT Corridor — <br />27 <br />C6a <br />Technical memorandum detailing findings of the <br />3.3.6 <br />design phase documentation review <br />Westminster/17 Street BRT Corridor — All Final <br />optimized and synchronized traffic signal timing <br />plans in Synchro format and the preferred timing <br />28 <br />C7a <br />chart format of each agency, including (a) <br />3.3.7 <br />existing corridor conditions and (b) planned and <br />programmed improvements (widening projects <br />and intersection improvements) within the next <br />five years after NTP . <br />29 <br />C7b <br />Westminster/l 7t Street BRT Corridor — Final <br />3.3.7 <br />Time -Space Diagrams <br />30 <br />C7c <br />Westm i n ste r/ 17 th Street BRT Corridor — Final <br />3.3.7 <br />Signal Timing Optimization Plan <br />Westminster/l Vo Street BRT Corridor — <br />31 <br />C7d <br />Electronic Synchro 7.0 data files used in the Final <br />3.3.7 <br />analysis <br />Westminster/17 Street BRT Corridor — <br />32 <br />C7e <br />Electronic Sim Traffic data files used in the Final <br />3.3.7 <br />analysis <br />Westminster/17 Street BRT Corridor — <br />33 <br />C7f <br />Electronic Versions of the Final analysis and all <br />3.3.7 <br />data files including the Tru-Traffic TS/PP files <br />34 <br />C8a <br />Westminster/17 Street BRT Corridor — Project <br />3.3.8 <br />Meeting Agendas <br />35 <br />C8b <br />Westminster/17 th Street BRT Corridor — Project <br />3.3.8 <br />Meeting Minutes and Action Items <br />36 <br />C8c <br />Westminster/l 7t Street BRT Corridor — Action <br />3.3.8 <br />Item Matrix <br />SECTION 4.0 TRAFFIC SIGNAL SYNCHRONIZATION IMPLEMENTATION <br />Bristol/State College BRT Corridor - Technical <br />memorandum containing field implementation of <br />optimized traffic signal plans for existing corridor <br />37 <br />Ala <br />conditions, including all required fine tuning and <br />4.2 <br />timing charts as requested by AUTHORITY and <br />agency, and final signal timing implementation <br />Ian. <br />38 <br />A2a <br />Bristol/State College BRT Corridor - List of <br />4.2.1 <br />Materials, Units, and Prices <br />Scope of Work 107 05/18/10 <br />