My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 - JOINT DT Parking and Wayfinding
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
03/07/2011
>
05 - JOINT DT Parking and Wayfinding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:33:00 PM
Creation date
3/10/2011 11:09:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
05
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f1~COM <br />AECOM <br />999 W. To~rm & Country Road, Drange, GA 92888 <br />T 714.547.2501 F 714.647.2441 vnnv.aecont.com <br />The cost of the architectural service Is based on each parking structure and its scope of work. <br />3rd Street and Birch Parking Structure; <br />Architectural scope of work: <br />AECOM will perform a one day Feld Investlgatlon to review the accuracy of the architectural as-built <br />documentation for the areas of improvement described below. <br />AECOM will prepare a design solution and construction documents for the addition of two (2) new <br />overhead roll-up doors at the existing East vehicle entrance, <br />AECOM will prepare a design solution and construction documents for the addition of a new security <br />fence at the perimeter of Level 2. <br />AECOM will review the existing conditions, propose design solutions and prepare construction <br />documents for access compliance improvements for the following limited areas as directed by the Owner; <br />Path of travel at Southwest of parking structure to Include relocation of handicap parking stall, <br />reconfiguration of egress gala and land[ngs, and path of travel from egress door to the adjacent <br />sidewalk. <br />Fall protection at both stair towers In the Northeast and Southwest <br />Our review of the existing conditions includes only those items listed and is not a complete <br />analysis of the accessibility compliance of the parking structure. Other known deficiencies will not <br />be addressed per Owner direction, <br />AECOM will prepare a design solution and construction documents for the demolition and replacement of <br />existing security screens (Including metal plate blocking at existing panic hardware) at all pedestrian <br />egress gates and stairs on Level 1. <br />AECOM will review shop drawings, and prepare RFt responses for the scope described above during the <br />construction phase. We will complete three (3) one day site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described is $32,350 <br />Field Investlgatlon $1,015 <br />Design and Construction Documentation $25,755 <br />Construction Phase Services $5,b80 <br />3rd Street and Broadway Parking Structure <br />Architectural scope of work; <br />AECOM will perform a one day Field Investlgatlon to review the accuracy of the architectural as-built <br />documentation for the areas of improvement described below. <br />AECOM will prepare a design solution and construction documents for the addition of three (3) new <br />overhead roll-up doors at the existing North, South and East vehicle entrances, and each has an <br />adjacent fencing extension includes a pedestrian gate. <br />AECOM will prepare a design solution and construction documents for the addition of a new security <br />fence at the perimeter of both Level 1 and Level 2. <br />AECOM will prepare a design solution and construction documents for the addition of two (2) pedestrian <br />gates and adjacent 5-foot fencing extension both sides to secure entry from pedestrian bridges at the <br />North and East perimeters. <br />Review or Improve the accessibility compliance of the parking structure is not in the scope of work per <br />Owner directive. <br />AECOM will review shop drawings, and prepare RFI responses for the scope described above during the <br />construction phase. We will complete three (3) one day site visits for construction observation during the <br />construction phase, <br />The proposed stipulated sum for the scope described is $31,215 <br />Field Investlgatlon $1,015 <br />Design and Construction Documentation $23,850 <br />Construction Phase Services $6,350 <br />f1. i'. I~SOf`/I ifr'lll'if,fii'tdlt:Vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.