My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 - JOINT DT Parking and Wayfinding
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
03/07/2011
>
05 - JOINT DT Parking and Wayfinding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:33:00 PM
Creation date
3/10/2011 11:09:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
05
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5'"and Maln Parking Structure <br />Architectural scope of work: <br />AECOM will perform a 3-hour Field investigation to review the accuracy of the architectural as-built <br />documentation for the areas of Improvement described below. <br />AECOM w(II prepare a design solution and construction documents for the addition of a new security <br />fence at the perimeter of t.evel 2. <br />Review or Improve the accessibility compliance of the parking structure is not in the scope of work per <br />Owner directive. <br />AECOM will review shop drawings, and prepare RFI responses for the scope described above during the <br />construction phase. We will complete two (2) one day site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described is $20,500 <br />Feld investlgalioh $380 <br />Design and Construction Documentation $16,055 <br />Construction Phase Services $4,065 <br />5'"and Spurgeon Parking Structure <br />Architectural scope of work: <br />AECOM will perform a 3-hour Field Investigation to review the accuracy of the architectural as-built <br />documentation for the areas of Improvement described below. <br />AECOM will prepare a design solution and conslructlon documents for the addition of a new overhead <br />roll-up door at each existing vehicle entrance - a total of two (2) overhead roll-up doors <br />Review or improve the accessibility compliance of the parking structure Is not in the scope of work per <br />Owner directive. <br />AECOM will review shop drawings, and prepare RFI responses Tor the scope described above during the <br />construction phase. We will complete two (2) 3-hour site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described is $9,450 <br />Field tnvestigalion $380 <br />Design and Construction Documentation $7,185 <br />conslructlon Phase Services $1,905 <br />The total proposed stipulated sum for the scope of work at all four (4) parking structures Is $102,760 <br />based on the following breakdown: <br />3`d Street and Birch Parking Structure $32,350 <br />3`d Street and Broadway Parking Structure $31,215 <br />5'" and Main Parking Structure $20,500 <br />5'"and Spurgeon Parking Structure $8,450 <br />Project Specification Manual $9,245 <br />Should the Owner request AECOM's participallon at any conslructlon meetings, wo would be happy to <br />provide this service on a time and materials basis at an hourly rate of $125/hr. <br />!\F (;i lpd -tr„~i::;.~ort~2li~~ii : AECOM <br />
The URL can be used to link to this page
Your browser does not support the video tag.