My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 - JOINT DT Parking and Wayfinding
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
03/07/2011
>
05 - JOINT DT Parking and Wayfinding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:33:00 PM
Creation date
3/10/2011 11:09:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
05
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gregory Hefter <br />February 7, 2011- Page 3 <br />Coordinate any parking contro{ designs with the appropriate City Department or <br />consultant. <br />Allend meetings with AECCM and the Clty as may be required and make <br />presentations as requested or required. <br />SGA Construction Document Services: <br />SGA Architectural Construction Documents: <br />Prepare construction documents consisling of drawings and specilicatlons setting <br />forth the requirements for project constnaclton. The final construction documents will <br />be of sulliclent deiall to reasonably bid and build the protect by a competent generai <br />contractor familiar with this typo of work <br />The architectural construction documents are prepared from the approved Design <br />Development drawings with two~dimensional graphic representations, such as plans, <br />elevations, sections, and details indicating the design, location, size, and dimensions <br />of the project and of the parts thereof. Notes on the drawings and specitlcalions <br />support and explain the graphic representations. <br />Coordinate wllh AECOM for structural, mechanical and electrical Improvements. <br />Coordinate any required street improvements directly adjacent to tlrs Project with the <br />appropriate City Department or consultant. <br />Coordinate any slgnage and graphic designs with the appropriate City Department or <br />consultant. <br />Coordinate any parking control designs with the approprate Cily Department or <br />consultant. <br />Attend meelings with AECOM and the Cily as may be required and make <br />presentations as requested or required. <br />Plan Check; <br />Submit the appropriate documents to the various governmental departments for the <br />purpose of checking plans prior to issuing building permits, <br />Coordinate with the various governmental agencies and make adjustments necessary <br />to the architectural construction documents and coordinate any requirements with <br />AECOM and other Cily consultants so that they will satisfy the requirements for <br />Issuance of a building permit. <br />SGA Construction Administration Services; <br />General <br />SGA will provide services during the course of construction on an as needed basis to <br />assist AECOM and the Clly in the bidding and selecilon of an overall Protect <br />i y}`,j,,._, Construction Manager and/or General Contractor and will be avalfable to provide the <br />k4;~if<iy services indicated below within the allotted amount indicated In the Compensation <br />"'; sectlan below. <br />~ttz`5~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.