My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05 - JOINT DT Parking and Wayfinding
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
03/07/2011
>
05 - JOINT DT Parking and Wayfinding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:33:00 PM
Creation date
3/10/2011 11:09:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
05
Date
3/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr, Gregory hiefter <br />February 7, 2011-Page 4 <br />Construction Observation: <br />Make visits to the site during the conslrucfion of the project, review the progress and <br />quality of the Work and to determine in general if the Work is proceeding in <br />accordance with the contract documents and the general conditions of the contract. <br />Provide assistance to the contractor and subcontractors as is reasonably required to <br />explain or interpret the drawings, <br />Shop Drawings and Submittal Review: <br />Review and take appropriate action on shop drawings, product data, samples, and <br />other submittals required by the conslrucilon documents, <br />Addendums, Bulletins and Change Orders: <br />Prepare Addendums prior to Iite construction contract award and Bulletins alter the <br />construction contract is awarded or construction has commenced. Addendums and <br />Bulletins will provide the contractor with Information relating to cladllcation, <br />documentation of field changes, detail changes and Client changes. The Architect <br />shall review and respond to Change Orders submitted by the general contractor. <br />Request for Information (BFI's); <br />Review and respond to requests for Information or cladlication submitted by the <br />general contractor, BFI's resulting 1n a change to the contractor's contract shall be <br />issued as an Addendum or a Bulletin. <br />COMPENSATION; <br />Professicnal Pees: <br />SGA shall be compensated for the Design Deveiopment and Construction Documont <br />Phase hourly with a not to exceed amount of Twenty Two Thousand Flve Hundred <br />Dollars ($22,500), For the conslrucilon Administration phase SGA shall be <br />compensated hourly vrith a not io exceed amount of Two Thousand Five Hundred <br />Dollars ($2,500) on an as needed basis. <br />Houriv Rates: <br />Principals $2loperhour <br />Sr, Associates $170 per hour <br />Associates $130 per hour <br />Project Architect $12D per hour <br />Dosigner $i0operhour <br />Clerical $ 6operhour <br />REIMBURSABLE EXPENSBS: <br />~``'`} ^_ ~'~=.~ Reimbursable expenses are In addition to compensation noted above and Include expenses <br />~~:s~;::~'3,t <br />~J~•'-..~~ ~ made by SGA, These expenses shall Include computer plots, blueprinting and reproduction, <br />~' `° -~ _"~ photo work, overnight delivery and messenger delivery services, renderings and mo a s. <br />Reimbursable expenses will be billed at 1.15 x actual cost, Plotting by SGA will be billed at <br />$1.501 sf. <br />
The URL can be used to link to this page
Your browser does not support the video tag.