Laserfiche WebLink
., t$ i <br />~ECOM <br />AECOM <br />999 W. Tovrn & Gountry Road, Orange, CA 928fi8 <br />T 714.5622501 F 714,567,2441 rnwi.aecom.com <br />February 10, 2011 <br />Mr. Jason Gabriel <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, California 92702 <br />Dear Jasan, <br />~~, <br />Subject: Flosta Marketplace Parking St`tucture Final Design <br />This fetter Is AECOM's proposal for services associated with security upgrades at three City of Santa Ana <br />parking structures and architectural, structural, and. security upgrades at the Fiesta Marketplace parking <br />structure. The basis of our scope of work is the assessment matrix prepared by the City and a field walk <br />on February 3, 2011, Tha field walk Included with Cily staff, AECCM staff, and a PCI manager. <br />For services related tc the Fiesta Marketplace, AECCM prepared a proposal in June, 2010 which <br />Included engineering and architectural services noeded to prepare contract documents and construction <br />support for the improvements listed in an assessment report dated May 21, 2010. It is my understanding <br />that those improvements will be Incorporated Into this project and this proposal therefore includes iha <br />effort previously described plus some addillonal security enhancements, <br />Four parkin structures are contained in this proposal and scope of work, They Include: 3`a and Birch; 5'h <br />and Main; 5 and Sturgeon (Fiesta Marketplace garage); and, 3`d and Broadway, <br />We havo two subconsultants on our team: Nestor+Gaffney and the Structural Group, Structural Group <br />will provide Inspection and repair of the post-tensioning tendons in the Fiesta Marketplace parking <br />structure and Nestor+Gaffney will provide architectural services for the same garage. <br />General Scope of Work Items <br />The scope of work for this proposal is to prepare contract documents for tho Improvements described <br />bolow. The proposal does not include soismic analysis or retrofit of any structures, fire sprinklers, parking <br />lot ingresslegress controls, or modifications to the sidewalks or public streets around the parking <br />structures. <br />in addition, video surveillance camera systems are not Included in this proposal since tho final decision of <br />whethor to Include them has not yet been made, <br />The contract documents will be to City of Santa Ana standards and will Include plans, specifications, and <br />coniract provisions. It is assumed that the City's standard boilerplate contract document will be used as a <br />basis and updated with the project's information to form the final contract documents. This will be <br />performed by AECCM as part of this proposal. <br />The scope of work also includes construction administration (CA). For this scope of work, CA (s defined <br />as support tb the City during the bid phase which Includes answering bid questions. CA also includes <br />periodic field visits during construction (four visits), answering of requests for information (RFis), and: ., <br />reviewing shop drawings as called for in the technical specltications. The City will advertise, collect bids, <br />analyze bids, and award construction contract; this work in not included with this proposal. This proposal <br />does not include administration of the consiructlon contractor's contract, daily or frequent inspections, <br />tracking of changes during consiructlon, or oversight of the contractor's work. <br /> <br />