Laserfiche WebLink
AECOM will prepare a cost estimate for the improvements, and provlde management and coordination <br />during the design, <br />Other assumptions Include: <br />Submittal of the drawings will be made for the 50% milestone; 100% draH package; and tinal construction <br />documents. <br />Drawings will be in Autocad. <br />No geotechnical services are Included <br />The hourly rates for 2011 are as listed fn AECOM's On-Call contract (City contract nurnber A-2006.216). <br />That rate sheet is attached for reference. <br />The detailed proposals from Nestor+Gaffney and Structural Group are attached which further specify the <br />scope of work and fee for each of their tasks. <br />Protect Specifics - 5rh and Spurgeon (Fiesta Marketplace? <br />Services will Include those described in the Fiesta Marketplace Assessment Report dated May 21, 2010. <br />In general these items Include preparation of final construction documents which wilt include architectural <br />upgrades, structural repairs, lighting upgrades, ADA compliance, and post-tensioning tendon inspection <br />and repair within the parking structure. <br />In addition to Assessment Report, the scope of work includes: <br />Security fence around the perimeter of level 2 of the structure. <br />Panic hardware on all exterior doors, and screening around those doors to enhance security. <br />Design solutions for two overhead roll-up security doors at each vehicle entrance. <br />The scope of work for this parking structure Includes the following: <br />Architectural Services <br />As listed in the proposal from Nestor+Gaffney which is Included as Attachment 8 in this proposal. <br />Security fence around the perimeter of Level 2 of the structure. <br />Panic hardware on all exterior doors, and screening around those doors to enhance security. <br />Design solutions for two overhead roll-up security doors at each vehicle entrance. <br />Structural Enoinaering <br />Identify damaged and spallad concrete. <br />Identify location of exposed post-tensioned strands on floor plans, <br />Review and coordinate repair works for strands with subcontractor. <br />Provide design and detail as needed to attach new sign to the structure at north entrance. Slgnage will <br />be designed by the sign vendor (by others) who will supply the reaction loads at anchor points. <br />Provide design and detail of supports as needed for roll-up doors. <br />Provide detail to eliminate pending atone column location on ground floor. <br />Coordinate with other consultants and governing agencies as required, <br />Respond to plan check comments. <br />Prepare calculations, drawings, and book specification for all recommended works. <br />provlde CA during construction. <br />Efecfricai Engineering <br />Verify as-built drawings. <br />Power plans to Include the upgrade of gate controls and the installation of electrically operated overhead <br />roll-up doors. <br />Prepare electricai drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals. <br />Note: It is our understanding that the lighting improvements within this structure will be undertaken by PCI <br />and we have therefore not Included any hours for that task or item. <br />~:.'i?C':.:~:~:1 4 :,rra~nr!crir.?n ' AECOM <br />