Laserfiche WebLink
ATTACHMENT I <br />SPECIFICATIONS AND REQUIREMENTS FOR POWER SWEEPING AT THE SARTC <br />Contractor shall supply all labor, materials, equipment and transportation necessary for the <br />removal of trash, dust and debris from parking lots, pedestrian walkways, vehicular entryways, <br />bus parking stalls, bus lanes and all four levels of parking structure of the SARTC as more <br />particularly described herein. <br />Contactor shall provide sweeping services in all designated areas two (two) times per week. City <br />reserves the right to increase the frequency of sweeping to three (3) times per week. All work at <br />the SARTC shall be performed between the hours of l 1pm and 4am. <br />The areas to be swept are designated on the site plan in Attachment F and consist of the <br />following: all entrances, driveways, curbs, parking lots, parking structure levels, bus lanes and <br />bus stalls, courtyard, exterior walkways, utility drive area and platforms. <br />Contractor must leave the area clean and free of all trash, dust and debris. The Contractor must <br />remove all of the trash dust and debris from the facility. The sweeping process must not damage <br />any surfaces. The sweeping process must not damage adjacent areas in any way. The contractor <br />will be responsible for all damage to the surrounding areas. <br />The City reserves the right to suspend the work wholly or in part if deemed necessary for the best <br />interest of the City. This suspension will be without compensation to the Contractor, other than to <br />adjust the contract completion /delivery requirements. <br />Hindrances or delays from any cause under this agreement shall be provided for by the Contractor <br />at no cost to the City. Such delays, if due to the fault or neglect of the City Coordinator, shall <br />entitle the Contractor to an extension of time allowed for completing the work sufficiently to <br />compensate for the delays. Contractor must notify the City Coordinator of any cause of delay. <br />The contractor, upon completion of the job and prior to final acceptance shall remove all supplies, <br />materials, debris, rubbish, etc. caused by the operation and leave the finished site in a neat, <br />orderly condition. <br />Sweeping must include area under and around vehicles parked in lots or in parking structure. In <br />or around all corners and recesses and other structures located within the sweeping area. <br />All curbs adjacent to the Depot property must be swept, removing all dirt and grime. <br />The Contractor will be responsible for the proper disposal of all waste, according to requirements <br />specified by the City. <br />