retaining wall, varying in height from 6' -4" to 16' -4" high. The last 14 feet of the sound wall is <br />constructed on a trench footing. <br />Anticipated Construction issues and Resolutions <br />In the table below we have identified general construction Issues we anticipate for this project and have <br />provided our proposed resolutions to these issues. <br />Construction Issue - Resolution <br />Utility Relocation Issues 0 <br />Set up early Pre - Construction and Utility Meetings <br />• <br />Request work plans with timelines <br />• <br />Pothole each utility prior to start of operations <br />• <br />Perform QA survey of each relocation <br />Citizen and Business -_..� 0 <br />__ -Stay proactive�_ -__„_ <br />Complaints <br />Keep locals informed of schedules and revisions <br />• <br />Keep Authority informed at all times <br />• <br />Maintain proper and thorough documentation <br />• <br />Expedite resolution <br />_ a <br />Proper use of City's Public Outreach (PR) /be respectful and responsive <br />Detour Modifications 0 <br />Maintain and monitor detours often <br />• <br />Keep City informed of potential issues <br />• <br />Expedite approval of any changes and coordinate with City <br />• <br />Monitor detours continuously <br />• <br />Keep detours clean and maintain proper signage <br />• <br />Modify detours to fit field conditions <br />• <br />Monitor traffic control to accommodate improvements /reduce bottlenecks <br />0 <br />Maintain bike trail access /use during construction <br />Local Business and a <br />Open accesses to residents and businesses ASAP <br />Residence Access 0 <br />Maintain continuous operations while working in sensitive areas <br />_ • <br />Seek alternatives with contractor <br />Dust and Noise • <br />_ <br />Establish a monitoring plan during pre - construction phase <br />• <br />Implement contract monitoring plan <br />• <br />Continuous use of water trucks <br />a <br />Use of soil stabilization and erosion control on disturbed areas <br />Contractor Potential Claims a <br />Partner with contractor <br />• <br />Elevate issues immediately if necessary <br />• <br />Maintain proper and factual documentation <br />0 <br />Create /update as -built (actual) vs. as- planned (proposed) schedule <br />Demolition Plan <br />Set -up pre - construction meeting with the contractor <br />• <br />Explore the removal method. Request a presentation by the contractor. <br />• <br />Discuss the removal plan with the project designer and Caltrans oversight <br />• <br />Monitor the demolition closely to avoid potential damage to the existing facilities <br />• <br />Review and inspect the temporary support system <br />Coordination with orange 0 Involve the County Inspector early in the game <br />County Flood Control • proactive and effective communication <br />t • Acquire approval of the work plan by the County <br />•� Request the County Inspector attend the construction meeting <br />City of Santa Ana I Public Works Agency Page 17 <br />First Street Bridge Replacement { Construction Management <br />25E -42 <br />