My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-03-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
03/21/2011
>
FULL PACKET_2011-03-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 1:35:45 PM
Creation date
3/23/2011 2:49:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
3/21/2011
Destruction Year
2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structures Technical Understanding <br />The existing abutments at the First Street Bridge will move forward to accommodate a three -span <br />structure. The new structure will have ten pre- cast /pre - stressed (PC /PS) Bulb Tee concrete girders, which <br />will be 4' -8" tall, placed on seat type abutments. The new structure is 92 feet wide and 320 feet long with <br />three spans of 100 feet, 120 feet, and 100 feet each. The new structure will have an eight foot sidewalk on <br />both sides with a four foot raised median. <br />Both abutments are constructed on a 2' -6" high, eight foot wide, and approximately 98 feet long spread <br />footing resting on 20 inch pre -cast, pre - stressed concrete piles. These piles are ten straight and ten <br />battered. <br />Piers 2 and 3 are constructed on 2' -6" high, six feet wide and 94 feet long spread footings, which are <br />constructed on 38 piles, each with six battered piles <br />on each end. ;a <br />Utilities around the foundation area include: <br />• 84" RCP sewer (to be protected in place) <br />• 16" water main on bridge (to remain in place <br />during Stage 1 construction and relocated <br />during Stage 2 construction) <br />• Fiber optics (to be protected in place) <br />• OH electric (to be relocated by others) <br />• 6" sub drain to be removed and relocated <br />• 72" GWRS line (to be'protected in place) <br />• 18" RCP storm drain <br />(to be protected In place) <br />Retaining Wall and Sound Wall Detail <br />The retaining wall at abutment 1 is a mechanically <br />stabilized earth (MSE) wall approximately 288 feet <br />long, resting on leveling pads. <br />The retaining wall at abutment 4 consists of: <br />• Type 5 SSW, which is constructed on <br />a spread footing. This retaining wall is <br />approximately 72 feet long and requires 2' -6" <br />of over - excavation under the footing. <br />• MSE wails are approximately 398 feet long <br />and rest on a leveling pad. There will be <br />a sound wall constructed on top of this <br />TYP1cAL SECT1oN <br />First Street Bridge Typical Section <br />nrnvs- <br />r��• *K. <br />M loll i <br />Retaining Wall Cross Section <br />1"Itt City of Santa Ana I Public Works Agency <br />First Street Bridge Replacement I Construction Management <br />25E -41 <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.