Laserfiche WebLink
have been included herein to further reduce impacts from GHG emissions. The incremental change <br />quantified in this analysis demonstrates that the proposed project will not result in a considerable <br />increase in GHG emissions from the 2005 project. The FEIR remains adequate and complete. <br />VIII. Hazards and Hazardous Materials <br />a) Would the project create a significant hazard to the public or the environment through the routine <br />transport, use or disposal of hazardous materials? (No Substantial Change from Previous Analysis) <br />A Phase I Preliminary Environmental Site Assessment and a Phase II Screening Subsurface Assess- <br />ment were performed and discussed in the FEIR. Mitigation measures were included in the FEIR to <br />reduce potential impacts identified in the Assessments to a less than significant level. No changes have <br />occurred from that analysis. Therefore, the FEIR as certified will remain adequate and complete for <br />this topic . <br />b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and <br />accident conditions involving the release of hazardous materials into the environment? (No <br />Substantial Change from Previous Analysis) <br />Neither the construction nor the operation of the proposed project Will involve hazardous materials that <br />might unwittingly be released into the environment. Therefore, there will be no impact due to the <br />accidental release of such materials. The FEIR as certified will remain adequate and complete for this <br />topic. <br />c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste <br />within one - quarter mile of an existing or proposed school? (No Substantial Change from Previous <br />Analysis) <br />The project involves modifications to the previously approved condominium component and no <br />hazardous or acutely hazardous materials, substances, or waste will be emitted due to the normal <br />operation of the project. 114o changes have occurred in this area from the analysis provided in the FEIR. <br />The development of the project will have no new or more severe impacts beyond those addressed and <br />mitigated in the FEIR. <br />d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to <br />Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public <br />or the environment? (No Substantial Change from Previous Analysis) <br />The proposed site is not included on a list of hazardous materials sites and would not create a <br />significant hazard to the public or the environment. No changes have occurred in this area from the <br />analysis provided in the FEIR. Therefore, the FEIR remains adequate and complete for this topic. <br />e) For a project located within an airport land use plan or where such a plan has not been adopted <br />within two miles of a public airport or public use airport, would the project result in a safety hazard <br />for people residing or working in the project area? (No Substantial Change from Previous Analysis) <br />The nearest public use airport, John Wayne Airport, is approximately 1.1 miles from the site. No new <br />or more severe impacts beyond those addressed and mitigated in the FEIR will occur. Therefore, the <br />FEIR remains complete and adequate as it relates to airport hazards. <br />MacArthur Place South EIR — 2011 Addendum 29 <br />