Laserfiche WebLink
For Q pYOJ2Ci WIiI11i1 the VIClillly Of a private airstrip, would the project result in a safety hazard for <br />people residing or working in the project area? (No Substantial Change from Previous Analysis) <br />The project is not located within the vicinity of a private airstrip and, therefore, would not expose <br />people residing or working in the project area to a safety hazard. Therefore, the FEIR remains complete <br />and adequate. <br />g) Would the project impair implementation of or physically interfere with an adopted emergency <br />response plan or emergency evacuation plan? (No Substantial Change from Previous Analysis) <br />The modifications to the condominium component will not produce any physical constraints or impair <br />an adopted emergency response plan or an emergency evacuation plan. Standard conditions have been <br />imposed regarding provision of fire access roads and fire lane markings as well as project review by <br />the Fire Authority. As analyzed in the FEIR, there will be no impact related to impairment of <br />emergency response plans or emergency evacuation plans. <br />h) Would the project expose people or structures to a significant risk of loss, injury or death involving <br />wildland fires, including where wildlands are adjacent to urbanized areas or where residences are <br />intermixed with wildlands? (No Substantial Change from Previous Analysis) <br />No wildlands exist within the project site or within the vicinity of the project. No changes have <br />occurred in this area from the analysis provided in the FEIR. Therefore, the FEIR remains adequate <br />and complete for this topic. <br />IX. Hydrology and Water Quality <br />Hydrology and water quality impacts due to short -term construction activities and long -term operation were <br />identified in the FEIR. Mitigation measures were included in the FEIR to reduce potential impacts and are <br />incorporated herein by reference. These mitigation measures will be implemented as part of the project and <br />will reduce short -term construction and long -term operational impacts to a less than significant level. <br />a) Would the project violate any Regional Water Quality Control Board water quality standards or waste <br />discharge requirements? (No Substantial Change from Previous Analysis) <br />A Preliminary Hydrology Study of Existing and Proposed Conditions and a Water Quality Manage- <br />ment Plan were prepared for the MacArthur Place South project. The FEIR identified impacts to <br />hydrology and water quality that would result from project implementation. Recommendations from <br />the technical studies for hydrology and water quality will continue to be observed. No changes have <br />occurred in this area from the analysis provided in the FEIR. Therefore, the FEIR remains adequate <br />and complete for this topic. <br />b) Would the project substantially deplete groundwater supplies or interfere substantially with <br />groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the <br />local groundwater table level (i.e., the production rate of pre - existing nearby wells would drop to a <br />level which would not support existing land uses or planned uses for which permits have been <br />granted)? (No Substantial Change from Previous Analysis) <br />No changes have occurred in this area from the analysis provided in the FEIR. Therefore, the FEIR <br />remains adequate and complete for this topic. <br />MacArthur Place South EIR - 2011 Addendum 30 <br />