Laserfiche WebLink
Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br /> until more program funds are available. <br /> MM4.11-5Main Street at First Street-Install <br /> a second northbound and southbound left- <br /> turn lanes and a dedicated northbound right- <br /> turn lane for 2030 and 2035 conditions. <br /> MM4.11-6Lacy Street at Santa Ana <br /> Boulevard-Install a traffic signal and provide <br /> exclusive left-turn lane for both northbound <br /> and southbound directions for both 2030 and <br /> 2035 conditions. <br /> MM4.11-7 Lacy Street at First Street-Install a <br /> traffic signal for both 2030 and 2035 <br /> conditions, a traffic signal, and provide <br /> exclusive left-turn lane for both northbound <br /> and southbound directions for both 2030 and <br /> 2035 conditions. <br /> MM4.11-8 Santiago Street at Washington <br /> Avenue-Install a traffic signal and provide <br /> one exclusive left-turn lane for both <br /> eastbound and westbound traffic for 2035 <br /> conditions only. <br /> MM4.11-9 Santiago Street at Civic Center <br /> Drive-Install a traffic signal and provide: one <br /> exclusive left-turn lane, one through lane, and <br /> one shared through and right-turn lane on <br /> northbound and southbound approaches; and <br /> one exclusive left-turn lane and one shared <br /> through and right lane on eastbound and <br /> westbound approaches. The improvement is <br /> only needed for 2035 conditions. <br /> MM4.11-10 Santiago Street at Santa Ana <br /> Drive-Construct a second southbound left- <br /> turn lane for 2035 conditions. The <br /> improvement is only needed for 2035 <br />Transit Zoning Code (SD 84) EIR Findings of Fact/Statement of Overriding Considerations 2-43