Laserfiche WebLink
Chapter 2 CEQA Findings <br /> <br /> <br />Impact Statement <br /> <br />Evidence/Rationale Supporting Findings <br /> <br />Mitigation Measures <br /> <br />Findings Level of <br />Significance after <br />Mitigation <br /> conditions. <br /> MM4.11-11 Santiago Street a Fourth Street- <br /> Install a traffic signal. The lane configuration <br /> for the signal is recommended as 1 Left, 1 <br /> Through, 1 Through+ Right for all <br /> approaches. <br /> MM4.11-12 Standard Street at First Street- <br /> Construct third eastbound and westbound <br /> shared through-right lanes for 2035 <br /> conditions. The improvement is only needed <br /> for 2035 conditions. <br /> MM4.11-13 Grand Avenue at Santa Ana <br /> Boulevard-Construct a third southbound <br /> through lane and eastbound right-turn overlap <br /> signal phasing. <br /> MM4.11-14 Grand Avenue at First Street- <br /> Construct a third eastbound shared <br /> through/right-turn lane, a third westbound <br /> shared through/right-turn lane, and a third <br /> northbound through lane with dedicated <br /> northbound right-turn lane for 2035 <br /> conditions. The improvement is only needed <br /> for 2035 conditions. <br /> MM4.11-15 Grand Avenue at 1-5 Northbound <br /> Ramps-Construct a second westbound <br /> right-turn lane and for the 1-5 northbound off <br /> ramp under both 2030 and 2035 conditions. <br />2-44 Revised Station District Project and FOIL Settlement Agreement Findings of Fact/Statement of Overriding Considerations