Zouheir Soleh, P
<br />Quality Assurance/Quality Control
<br /> ? 31 Years of Caltrans
<br />Mr. Saleh has 31 years of construction management experience working for Experience
<br />Caltrans Department of Structures. He has worked on variety of structures ? 15 Years as Caltrans
<br />project such as new freeways, bridges, interchanges, seismic retrofit projects, Senior Structures
<br />structures rehabilitation projects, historic structures renovation, retaining Engineer
<br />walls, MSE walls, sound walls, culverts, tunnels, and overhead structures. He ?
<br />
<br />has worked on project including falsework, shoring review, processing change 2 Years as Instructor
<br />of Resident Engineer
<br />orders, resolving conflicts, coordination with designers, and resolves all field Academy
<br />issues. He has worked on all aspects of structures construction and is an
<br />
<br />expert in contract documentation, falsework design and approval, structures ? Recipient of
<br />
<br />construction documentation procedures, claim resolution procedures, DRB Numerous
<br />Achievement Awards
<br />selection committees, and contract closeout. In depth understanding of
<br />Caltrans Standard Specifications, Construction Manual, Bridge Construction ? Traffic Control,
<br />Record and Procedure, Safety committee, Technical expertise in bridge Safety, & SWPPP
<br />construction, falsework and shoring evaluations, wet pile construction, CIDH ? State & Federally
<br />pile construction, retaining walls, Soundwalls, and MSE wall construction, Funded Project
<br />seismic retrofit of bridges and demolition, oversight of construction work. Expertise
<br />Prior Experience Education:
<br /> BS, Civil Engineering
<br />1-405/Del Arno Boulevard Overcrossing (Dominguez Channel Bridge),
<br />Caltrans District 7, Carson, CA Registration:
<br />
<br />Senior Structure Engineer responsible for construction oversight on this $10 CA, Civil Engineer,
<br />No. 82441
<br />million project consisting of a precast concrete girder bridge spanning over
<br />Dominguez Channel and 1-405 at Del Amo Boulevard. This project involved certifications:
<br />abutment retrofit, pile caps for lateral stability, and foundation retrofit by the District Instructor
<br />addition of steel shell pipe piles. for ream Building
<br /> Structure Inspection
<br />1-710 Eastside/Compton Creek BOH, Los Angeles
<br />CA
<br />, Office Procedures and
<br />Three span bridge widening over Compton Creek involving cofferdams Contract Administration
<br />construction and piling to support erection of falsework. CPM Scheduling
<br />
<br />San Gabriel River Bridge Retrofit, Los Angeles, CA Contract Change Order
<br />Chang
<br />
<br />This project consisted of 5 spans over the San Gabriel River involving the Bridge Fa
<br />k Academy
<br />
<br />retrofit of piers and abutments, replacement of bearing pads, and construction Resident Engineer
<br />Workshop and Academy
<br />of falsework to temporarily lift the bridge for the retrofit. Partnering on
<br />
<br />Balogna Creek Bridge Widening, Culver City, CA Caltrans Projects
<br />
<br />This project involved the erection of falsework in the water stream for the Construction Storm Water
<br />Prevention and Pollution
<br />widening of the 3 span bridge. Construction Surveys
<br /> Dispute Review Board
<br />MILL City of Santa Ana Public Works Agency Page I 1
<br />First Street Bridge Replacement I Construction Management
|