My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HILL INTERNATIONAL INC.-2011
Clerk
>
Contracts / Agreements
>
H
>
HILL INTERNATIONAL INC.-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 10:49:24 AM
Creation date
6/23/2011 5:22:51 PM
Metadata
Fields
Template:
Contracts
Company Name
HILL INTERNATIONAL INC.
Contract #
A-2011-072
Agency
PUBLIC WORKS
Council Approval Date
3/21/2011
Insurance Exp Date
4/1/2013
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kofi Baryeh, PE <br />Office Engineer _.- <br />Mr. Baryeh has 14 years of progressively responsible experience in civil/ <br />structural engineering. Mr. Baryeh has a combination of excellent technical, <br />analytical, and engineering qualifications with demonstrated achievements <br />in delivering projects on time and within budget. He has strong leadership, <br />management, communication, and problem-solving skills, along with a <br />working knowledge of various computer programs, including Microsoft Word, <br />Excel, Power Point, AutoCAD LT, Etabs, Risa-2D and Ramsteel. <br />Prior Experience <br />SR-22 Design/Build Widening, Orange County, CA <br />Structures engineer responsible for 3 cast-in-place and 4 pre-cast bridges. <br />Tracked costs and quantities for each bridge and provide quarterly forecasts <br />to project office. Provided layouts and elevations per contract plans and <br />specifications to support bridge construction. Developed structural concrete <br />pour tracking schedule for project. Provided falsework, bent layout, and <br />bridge elevations via 4-scale. <br />Benicia Bridge, Benicia, CA <br />Falsework bridge engineer responsible for developing construction sequence <br />for ramp box girders and bridge abutment. Determined material quantities, <br />detailed falsework, provided concrete pour lift drawings, determined cost <br />of materials and tools. Provided construction drawings via AutoCAD per <br />Caltrans plans and specifications, and provided hazard mitigation plans <br />for construction. Corresponded with Caltrans for clarifications and sent <br />submittals as required per contract for approval. Presented construction <br />work plans with associated schedule to management. <br />McCarran International Airport, Las Vegas, NV <br />Project engineer/manager responsible for managing/processing contract <br />change orders and pay applications to Bechtel via McCarthy Builders. <br />Additional responsibilities included forecasting project costs and profitability <br />monthly and reporting summary to corporate office. Coordinated, reviewed <br />submittals, including structural control joins layout to Bechtel, coordinated <br />Granite field activities with McCarthy's and Bechtel inspectors, monitored <br />progress, and ensured conformance to contract plans, specifications and <br />approved RFls. <br />? Work Plans/Project <br />Engineering <br />? Project <br />Management <br />? Contract <br />Administration <br />Education: <br />M.S., Civil <br />Engineering, UCLA <br />B.S., Civil Engineering, UCLA <br />Registrations: <br />Professional Engineer, <br />California <br />DIA: •YO URMAN <br />G«u??[ 5?.?-a <br />1"1111L City of Santa Ana I Public Works Agency Page 11 <br />First Street Bridge Replacement I Construction Management
The URL can be used to link to this page
Your browser does not support the video tag.