My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS BUILDING TECHNOLOGIES 6B - 2011
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS BUILDING TECHNOLOGIES 6B - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:08:00 PM
Creation date
8/8/2011 10:35:22 AM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS BUILDING TECHNOLOGIES
Contract #
A-2009-144-002
Agency
PUBLIC WORKS
Insurance Exp Date
10/1/2011
Destruction Year
0
Notes
A-2009-144-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, CA - Second Amendment to Agreement for ECMs <br />Exhibit A (Supplemental) - Scope of Work and Services <br />City of Santa Ana, CA - Second Amendment to Agreement for ECMs <br />Article 1: Scope of Work <br />1.1 Description: Except as otherwise expressly provided herein, Contractor shall <br />provide each and every item of cost and expense necessary for the following <br />Lighting Upgrades at various City facilities (the' Work"): <br />1.2 Specific Elements: The Work shall include the following: <br />Article 1.1 MUSCO LIGHTING AT DELHI PARK <br />Contractor shall provide and install Musco lighting controls at Delhi Park. <br />Equipment Installation <br />• Manufacturer warranty on all equipment <br />• Activation and testing of systems to ensure all units are fully functional <br />and operational <br />10 Years Control Link Central Service (CLC) <br />• 24/7 toll free access to CLC customer scheduling operators <br />• Access to Musco Control Link Scheduling Website <br />• REC operations and Website Training for scheduling staff <br />Delhi Park <br />• (1) Remote Equipment Controllers (REC's) <br />• (7) Remote Off/On Auto Switches <br />• (1) Remote Switch Box <br />• (4) 30 Amp Contactors <br />• (1) 16" x 16" x 6" Junction Box <br />• (2) 12" Din Rail <br />• (1) 2' x 4' piece of W plywood <br />Zone 1: Baseball <br />Zone 3: Handball <br />Zone 5: Restroom Exterior <br />Zone 7: Spare <br />Zone 2: Basketball <br />Zone 4: Security <br />Zone 6: Restroom Interior <br />Contractor shall provide and install Musco lighting controls at Spurgeon Intermediate <br />School. <br />Equipment Installation <br />• Manufacturer warranty on all equipment <br />• Activation and testing of systems to ensure all units are fully functional <br />and operational <br />10 Years Control Link Central Service (CLC) <br />• 24/7 toll free access to CLC customer scheduling operators <br />• Access to Musco Control Link Scheduling Website <br />• REC operations and Website Training for scheduling staff <br />• REC#1 Spurgeon Intermediate School North Switch Gear <br />• (9) 30 Amp Large frame Contactors <br />Page 1 of 13 <br />Siemens Industry, Inc., Building Technologies Division <br />Exhibit A (Supplemental) - Scope of Work and Services <br />v.061611
The URL can be used to link to this page
Your browser does not support the video tag.