My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NATIONAL DATA & SURVEYING SERVICES 2 - 2011
Clerk
>
Contracts / Agreements
>
N
>
NATIONAL DATA & SURVEYING SERVICES 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 5:10:54 PM
Creation date
10/5/2011 12:06:41 PM
Metadata
Fields
Template:
Contracts
Company Name
NATIONAL DATA & SURVEYING SERVICES
Contract #
N-2011-119
Agency
PUBLIC WORKS
Expiration Date
6/30/2012
Insurance Exp Date
9/17/2013
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N� S <br />l�Tat3onal Data 8c Surveying Services <br />Corporate Office <br />8370 Wilshire Blvd. Ste 209 <br />Beverly Hills, CA 9021 I <br />T- (323) 782 -0090 <br />F- (323) 375 -1666 <br />Email: Infona..ndsdata.com <br />24 -hour Sing /e/�ua/ -tube Counts: <br />• Locations are given to the Field Manager for review and collection planning. <br />• A site check is made to access the optimum machine location, flow and geometry of the street. <br />• Data collectors meet with Field Manager minimum one <1) day before count to review requirements, <br />machine locations, and safety issues. <br />• Only experienced staff and state -of- -the -art equipment will be used. <br />• Rubber hoses will be checked and damaged tube will be replaced. <br />• Lo profile rubber hoses will be used to reduce the risk of injury to pedestrians and bicyclists. <br />• Computerized counters will be setup on the day prior to the day of the count and will be picked up <br />the morning after the count to ensure a full 24 -hour count (midnight to midnight). <br />• The tube length for all machine counts shall not exceed 60 foot and should not extend more than <br />three (3) lanes. <br />• Counts will be conducted according to the City of Santa Ana's protocol on Tuesday, Wednesday, <br />and Thursday. Field Manager checks data collection throughout the day to ensure proper <br />procedures are being followed. <br />• Counts will be broken down by 15 minute increments_ <br />• Entering (approach) volume counts will be taken at locations where driveway and other turning <br />_movements will not adversely affect counts. <br />• Counters are downloaded in the field, analyzed for any problems. If problems are discovered the <br />machine counter is reset and the count is redone at no cost to the City. <br />• One two - directional hourly count sheet data fife and one two - directional fifteen minute count <br />sheet/data file for each ADT volume (separated by directions as appropriate), and peak hourly <br />volumes. Each sheet will contain all legs. of the intersection <br />• One hourly and one 15- minute count sheet/data file shall be prepared for each entering (approach) <br />traffic volume count. <br />• if requested, NDS has the capability to compile. all citywide "Street Segment Count" data into a City <br />Traffic Ftow Map <br />• The variation in hourly volumes can also be graphically presented for each location, if requested. <br />• Data elements collected will be as specified in the RFP. <br />• Data is turned into our office for process and formatting for delivery to City. <br />• Project Manager proofs the data for quality control before releasing to City. <br />Data is delivered to City in accordance with the requirements of the RFP. <br />Manua/ Turning Movement and Pedestrian Counts: <br />• Locations are given to the Field Manager for review and collection planning. <br />A site check is made to access the flow and geometry of the intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.