Laserfiche WebLink
N�� S <br />National Data 8z Surveying Services <br />Corporate Office <br />8370 Wilshire Blvd. Ste 209 <br />Beverly-Hiils, CA 90211 <br />T- (323) 782 -0090 <br />F- (323) 375 -1666 <br />Email : Info (7a .n d s d ata . c o m <br />• Data collectors meet with Field Manager minimum day before count to review requirements, <br />collection plan, and safety requirements. <br />• Counts wilt be conducted according to the City of Santa Ana's protocol on Tuesday, Wednesday, <br />and Thursday. Counts periods will be the peak hours requested by the City, one, tw_o or three peek <br />periods. <br />• Field Manager checks data collection throughout the day to ensure proper procedures are being <br />followed. <br />• Field Manager collects data after evening peak court #, assembles data, and draws maps of each <br />intersection to ensure accuracy of lanes. <br />• Data elements collected will be as specified in the RFP. <br />• Peak hour turning movement count sheets /data files will show 15- minute counts and hourly totals for <br />each hour counted. In addition the peak hour (the highest four (4) consecutive 15- minute counts) <br />will be determined for each counting period. <br />For intersections, counts from all approaches can be provided separately for each approach, and /or <br />ail approaches together in one print -out. The AM, mid -day, and PM peak hour and corresponding <br />volumes will also be shown for each. approach. <br />• Data is turned into our office for process and formatting for delivery to City. <br />• _Project Manager proofs the data for quality control before releasing to City. <br />• Data is delivered to City in accordance with the RFP requirements. <br />24 -lour Vehicle Classification &Speed Counts: <br />• Same as Street Segment Counts above. <br />• Tubes are measured to ensure proper length a`nd proper count. <br />• Data elements collected wilt be as specified in the RFP. <br />• Data is reviewed by Field Manager for errors. <br />• Data is turned into our office for process and formatting for delivery to City. <br />• Project Manager proofs the data for quality control before releasing to City. <br />• Data is delivered to City in accordance with the RFP. <br />• Sample data is attached below. <br />Safety <br />• Two people perform machine counts. One for traffic control and one for the setup. <br />• Bright reflective vests are worn. <br />• Vehicles are equipped with orange warning light. <br />• Tubes are pre - measured to ensure safe and speedy setup. <br />