My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />feet, and this depth would increase with distance from the existing facility. Construction along this <br />segment of South Bristol Street would require supporting the utilities from the top of the trench <br />and /or the use of trench boxes /shields, which would elongate the construction schedule. Due to these <br />existing utility constraints beneath South Bristol Street, portions of this roadway would need to be <br />closed to accommodate construction associated with this alternative, which has the potential to result <br />in adverse effects to vehicular circulation. Implementation of this alternative would otherwise be <br />similar to the proposed Project during construction conditions. <br />Development of a lift station at Alternative Site No. 15 also would require the City to acquire private <br />property to implement a temporary construction easement, accommodate the proposed lift station, <br />and provide easements for proposed sewer lines. <br />3.4.17.2 Summary Comparison of Environmental Effects <br />The environmental effects of constructing the proposed lift station at Alternative Site No. 15 in <br />comparison to the proposed Project site are shown in Final EIR Table 5 -1 and described in detail in <br />RDEIR Section 5.4.17. This alternative would avoid the Project's significant and unavoidable <br />impact associated with Construction Configuration C.2; however, this alternative would create a <br />significant and unmitigable near -term impact to transportation /traffic due to a LOS deficiency that <br />would occur for approximately 90 days during construction, which is an increase in duration as <br />compared to the twenty -five (25) days of construction during which the proposed Project would <br />create a significant unavoidable impact to transportation /traffic at the South Bristol Street/West <br />Segerstrom Avenue intersection. Impacts to transportation/traffic would also occur when <br />construction activities disrupt left -turn movements, thereby diverting traffic to adjacent intersections <br />or encouraging cut - through traffic in local neighborhoods; such impacts would not occur in <br />association with the proposed Project. As such, impacts to transportation /traffic would be greater at <br />Alternative Site No. 14 as compared to the proposed Project site, and mitigation would not be <br />available to reduce these effects to less than significant levels, as there is no way to construct this <br />alternative without affecting the travel lanes within South Bristol Street, and because there is no way <br />to avoid affecting left turns along South Bristol Street during construction. <br />Total construction air quality /greenhouse gas emissions would be increased under this alternative due <br />to a longer construction period, although average daily construction emissions would be similar to <br />the proposed Project and would be less than significant. In addition, construction - related impacts to <br />water quality and hydrology would be increased under this alternative due to an increased area of <br />impact, although such impacts would be less than significant. Long -term odor impacts associated <br />with accident conditions and near -term noise impacts associated with nighttime dewatering activities <br />would be slightly decreased under this alternative, due to the increased distance to nearby sensitive <br />receptors, although as with the proposed Project such impacts would be less than significant due to <br />implementation of Mitigation Measures MM 3.3 -1 and 3.3 -2. Impacts related to noise, utilities and <br />service systems, and water quality and hydrology (long -term) would be similar to the proposed <br />Project and would be less than significant. <br />3.4.17.3 Finding and Rationale for Alternative Site No. 15 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 15 infeasible. <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -34 <br />CEQA Findings of Fact /Statement of Overriding Considerations <br />55A -73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.