My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />Alternative Site No. 15 would result in an overall increase in impacts to transportation /traffic as <br />compared to the proposed Project. Although this alternative would avoid the proposed Project's <br />significant and unavoidable impact to the south Bristol Street /West Segerstrom Avenue during the <br />five weeks in which Construction Configuration C.2 would be in place, this alternative would result <br />in a LOS deficiency that would occur for approximately 90 days during construction, and would <br />result in new significant unavoidable impacts due to the disruption of left -turn movements along <br />South Bristol Street. Impacts to turn movements would not occur in association with the proposed <br />Project. In light of these considerations, the City finds that Alternative Site No. 15 would result in an <br />overall increase in near -term impacts to transportation /traffic, and rejects this alternative as infeasible <br />because it would not avoid or substantially lessen any of the significant effects of the Project. <br />(CEQA Guidelines Section 15126.6(b).) <br />This alternative also is rejected as infeasible because it would fail to meet or would not be as <br />effective in achieving the proposed Project's objectives. This alternative would cause serious <br />disruptions to existing business along South Bristol Street due to the need to construct sewer lines <br />near the median, and would further disrupt the businesses within the shopping complex where this <br />alternative site is located. This alternative would therefore fail to meet the Project's objective of <br />avoiding detrimental effects to existing businesses. <br />3.4.18 Alternative Site Location No. 16 (Alternative Site No. 16) <br />3.4.18.1 Summary of Alternative Site No. 16 <br />Alternative Site Location Number 16 (Alternative Site No. 16) would involve the construction of a <br />new replacement lift station within an existing City park (Carl Thornton Park) located at 1801 West <br />Segerstrom Avenue in lieu of the proposed Project site. Alternative Site No. 16 is located <br />approximately 0.4 -mile west of the proposed Project site. The location of Alternative Site No. 16 is <br />depicted on Final EIR Figure 5 -1. <br />Development of a lift station at Alternative Site No. 16 would occur wholly within an existing City - <br />owned park; therefore, this alternative would not require the acquisition of private property. The lift <br />station that would be constructed at Alternative Site No. 16 would include an above - ground block <br />structure similar to the proposed Project. In addition, the lift station at Alternative Site No. 16 would <br />feature similar equipment and appurtenances as the proposed Project. This alternative would require <br />the installation and operation of approximately 208 percent more underground sewer conveyance <br />infrastructure than the proposed Project. The duration of Construction Phase 11 would be increased <br />as compared to the Project, to accommodate the construction of additional underground sewer <br />conveyance infrastructure. <br />Although the acquisition of private property that would occur as part of the proposed Project would <br />not result in a significant environmental effect, relocation of the proposed lift station to Alternative <br />Site No. 16 was selected for consideration to allow decision - makers to compare the impact of the <br />proposed Project against the impact of an alternative that would not require the acquisition of private <br />property. <br />3.4.18.2 Summary Comparison of Environmental Effects <br />The environmental effects of constructing the proposed lift station at Alternative Site No. 16 in <br />comparison to the proposed Project site are shown in Final EIR Table 5 -1 and described in detail in <br />RDEIR Section 5.4.18. Relocating the proposed lift station to Alternative Site No. 16 would slightly <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -35 <br />CEQA Findings of Fact /Statement of Overriding Considerations <br />55A -74 <br />
The URL can be used to link to this page
Your browser does not support the video tag.