My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 3 Findings Regarding Project Alternatives Attachment "A" <br />result in a significant and unmitigable near -term impact to traffic and circulation due to inadequate <br />emergency access (i.e., Garry Street). As such, impacts to traffic and circulation would be greater at <br />Alternative Site No. 17 as compared to the proposed Project site, and would be significant and <br />unavoidable. <br />This alternative also would result in an increase in the severity of long -term odor impacts as <br />compared to the proposed Project, because Alternative Site No. 17 is located in closer proximity to <br />existing sensitive receptors that could be exposed to odors under accident conditions; however, as <br />with the proposed Project, mitigation would reduce this impact to less than significant levels. In <br />addition, construction noise levels would be greater under this alternative due to the closer proximity <br />of residential land uses; however, construction noise impacts would be mitigated to less than <br />significant levels, as with the proposed Project. Total construction air quality /greenhouse gas <br />emissions would be increased under this alternative due to a longer construction period, although <br />average daily construction emissions would be similar to the proposed Project and would be less than <br />significant. In addition, construction - related impacts to water quality and hydrology would be <br />increased under this alternative due to a larger area of impact, but would remain below a level of <br />significance. Impacts related to noise (long - term), utilities and service systems, and water quality <br />and hydrology (long -term) would be similar to the proposed Project and would be less than <br />significant. <br />3.4.19.3 Finding and Rationale for Alternative Site No. 17 <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make Alternative Site No. 17 infeasible. <br />Alternative Site No. 17 would result in an overall increase in impacts to transportation /traffic as <br />compared to the proposed Project. Although this alternative would reduce by a period of three weeks <br />the proposed Project's significant unavoidable impact to the South Bristol Street/West Segerstrom <br />Avenue intersection, this alternative would create a significant and unmitigable near -term impact to <br />the capacity of South Bristol Street for a period of approximately 46 days, or 21 days longer than the <br />proposed Project's significant unavoidable impact to the South Bristol Street/West Segerstrom <br />Avenue intersection. Furthermore, construction of a lift station at Alternative Site No. 17 would <br />exacerbate an existing parking deficiency at this site both during construction and long -term <br />operation. Near- and long -term impacts to parking at Alternative Site No. 17 would be a significant <br />and unmitigable impact. Construction activities at Alternative Site No. 17 also would result in a <br />significant and unmitigable near -term impact to traffic and circulation due to inadequate emergency <br />access (i.e., Garry Street). In light of these considerations, the City finds that Alternative Site No. 17 <br />would result in an overall increase in near -term impacts to transportation /traffic, and rejects this <br />alternative as infeasible because it would not avoid or substantially lessen any of the significant <br />effects of the Project. (CEQA Guidelines Section 15126.6(b).) <br />This alternative also is rejected as infeasible because it would fail to meet, or would not be as <br />effective in achieving, the proposed Project's objectives. This alternative would not be as effective as <br />the proposed Project in meeting the Project's objective to minimize odor - related nuisances to land <br />uses in close proximity. In addition, this alternative would exacerbate an existing parking deficiency <br />at an existing commercial office building, and would, therefore, fail to meet the Project's objective of <br />avoiding detrimental effects to existing businesses. Detrimental effects to business would be further <br />exacerbated by ongoing construction in close proximity to the existing commercial office building. <br />Further, unlike the proposed Project site where the City has an existing sewer easement, construction <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 3 -38 <br />CEQA Findings of Fact /Statement of Overriding Considerations <br />55A -77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.