Laserfiche WebLink
Mr. Robert Silverstein, Esq. ! • <br />Review Of The Recirculated DEIR And FEIR For The San Lorenzo Sewer Lift Station Project <br />January 12, 2012 <br />Page 18 of 18 <br />Exhibits: <br />A. CWC -HDR Drawing 6 Of 10 For The 1989 Project, <br />B. CWC -HDR Drawing 6 Of 10 For The 1989 Project. <br />C. Invoice For Rehabilitating The Pumps In 2007. <br />D. Email From Gorman Rupp Saying Parts Are Readily Available. <br />E. Typical Lift Station Plan. <br />F. Typical Lift Station Section. <br />G. Submersible Pump Dimensions. <br />H. Performance Curve For A Suitable Pump For The Existing Segerstrom <br />Pump Station. <br />1. Submersible Pump Station Superior Project. <br />J. Estimated Cost Of A Submersible Pump Station In South Bristol Street. <br />K. Construction Schedule For The Proposed Project. <br />55A -167 <br />